Loading...
Amberpoint BP-LR020416 (2)FIELD DENSITY TESTING Report Number: 94021029.0199 Service Date: April 2, 2002 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 8901 Carpenter F[wy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 16, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Material Information Lab Test Data Project Requirements Optimum Max. Lab Water Water Dry Unit Content Minimum Dry Material Laboratory Content Weight Range Unit Weight No. Test Method Description and Classification (%) (pcf) (%) (% compaction) 1. 210290099 ASTM D-698 Dk & med brown, tan & it brown clay 24,6 92.3 0/+4 95 Field Test Data Probe Water Dry Unit Dry Unit Test Lift/ Mat. Depth Content Weight Weight No. Test Location Elevation No. (inches) (%) (pc~ (% compaction) Sanitary Sewer 291 Sta. 5+90 7' BEG 1 6 25.2 91.9 100 292 Sta. 5+85 6' BEG I 6 26.9 90.6 98 293 Sra. 5+80 5' BEG 1 6 27.3 88.3 96 294 Sta. 5+75 4' BEG I 6 26.2 87.7 95 295 Sta. 5+70 3' BEG I 6 26.9 87.8 95 296 Sta. 5+65 2' BEG I 6 27.3 90.6 98 297 Sra. 5+60 1' BEG 1 6 26.1 91.3 99 Datum:BEG = below existing grade Comments: Test results on this report meet project specification. Services - Perform in-place density and moisture content tests to determine degree of compaction and material moisture condition. Field Test Method~,STM D2922, ASTM D3017 Gauge ID: Field Results Reported To: Contractor Technician: Brad Rengstorff Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell - Bldg Insp (1) O'Bden & Associates Inc (1) Hill & Wilkinson Ud (1) TechniStructures Inc (1) Halff Associates Reviewed by: HBC E~I~ Eugene Harbour Principal (1) City of Coppell - Constr Insp (1) State Farm Insurance The tests were performed in generat accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identica~ materials, Page 1 of 1 o, so~0~*~,~.~ REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0186 Service Date: April 5, 2002 8901 Carpenter FnNy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 16, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Gerry Graham Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell- BId9 Insp (1) Hill & Wilkinson Ltd (1) Halff Associates Reviewed by: HBC En~ring Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of I ~" REPORT OF DAILY FIELD ACTIVITIES Report Number: 94021029.0146 Service Date: March 23, 2002 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 ENGINEERING 8901 Carpenter Fm/y., Suite#100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 16, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Daily field activities. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for observation of daily field activities. The following was observed and/or tested. HBC's technician observed the 2 foot overburden for verification of material size, moisture and compaction efforts in an area at grid lines 5 to 7 and A to Q. In-place density tests would be performed at a later date. Technician: Brad Rengstorff HBC Eng~J3~ Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell - BIdg Insp Reviewed by: (1) O'Brien & Associates Inc (1) Hill & Wilkinson Ltd Eugene Harbeur (1) TechniStructures Inc (1) Halff Associates Principal (1) City of Coppell - Constr Insp (1) State Farm Insurance The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shalt not be reproduced except in full without the written approval of Terracon, Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ® ®