Loading...
Amberpoint BP-LR020412 (2)REPORT OF DRILLED BELLED Report Number: 94021029.0153 Service Date: March 26, 2002 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 PIER OBSERVATION 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Report Date: April 12, 2002 **REVISED Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. **NOTE: Top of Pier Elevation was revised from 99.5 feet to 99.0 feet on 04/12/02. Technician: Gerry Graham Report Distribution: HBC En~g (1) Transwestern Commercial Services (1) City of Coppell - Bldg Insp Reviewed by: (1) O'Brien & Associates Inc (1) Hill & Wilkinson Ltd (1) TechniStructures Inc (1) Halff Associates Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~s~,~,. uJ uJ REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0158 Service Date: March 27, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: Apd112, 2002 **REVISED Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. (~ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled belled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. **NOTE: Top of Pier Elevation was revised from 99.5 feet to 99.0 feet and putting a Time Concrete was Placed for Pier E/9 on 04/12/02. Technician: Gerry Graham Report Distribution: HBC Engineer~ (1) Transwestern Commercial Services (1) City of Coppell - Bldg Insp (1) O'Brien & Associates Inc (1) Hilt & Wilkinson Ltd Reviewed by: (1) TechniStructures Inc (1) Halff Associates Eugene Harbour (1) City of Coppell - Constr Insp (1) State Farm Insurance Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~s~9~r~.~., ~ z