Loading...
Amberpoint BP-LR020411 (3)REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0182 Service Date: April 4, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 11,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 9402102g Services: Drilled belled pier observation On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Gerry Graham Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Constr Insp (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: HBC En.~ Eugene Harbour Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical materials. Page 1 of 1 ~F,,~..~ REPORT OF SOIL-LIME MIXTURE PULVERIZATION SgO) Cnt~mt~- Frwy., Suite 100 Dallas. Te~CL~ 75247 Date of Service: 04/02/02 Report No.: Client No.: 3181 Project No.: Client: Transwcstcm Commercial Services Project: 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 94021029.0176 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Contractor: Specification Requirements: Test Location: Grid lines A to H and ] to 6 Minimum Passing 1 3/4" Sieve: ]00% Minimum Passing ~4 Sieve: 60% Sample Condition: Field Moist lest Method: NTCOG TEST 1-314" SIEVE t/4 SIEVE NO. LOCATION % PASSING % PASSING 1 Grid line B.5/5, see attached sketch 100 67 2 Grid line D.5/5, see attached sketch 100 63 3 Grid line F.5/5, see attached sketch 100 64 4 Grid line C/3.5, see attached sketch 100 66 5 Grid line E/3.5, see attached sketch 100 65 6 Grid line G/3.5, see attached sketch 100 61 7 Grid line B/2, see attached sketch 100 63 8 Grid line D/2, see attached sketch 100 64 9 Grid line F/2, see attached sketch 100 66 Technician: B. Rengstorff Report Distribution: (1) Transwcstern Commercial Services (1) O' Bricn & Associates, Inc. (1) TcchniStructures, Inc. (I) City of Coppell - Constr. Insp. 309 Engineering, Inc. (1) City of Copp¢ll - Bldg. Insp. (1) Hill & Wilkinson, Ltd. n ~,~/ (1) Halff Associates (1) State Farm Insurance Euge Principal This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wrinen approval of HBC Engineering, Inc.