Amberpoint BP-LR020411 (3)REPORT OF DRILLED BELLED PIER OBSERVATION
Report Number: 94021029.0182
Service Date: April 4, 2002
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Client: Transwestern Commercial Services
Attn: Jim Gaspard
5001 Spring Valley Rd. Suite 600W
Dallas TX 75244
Report Date: April 11,2002
Project: Amberpoint Building No. 1
Amberpoint Bus. Pk. @ Coppell
Coppell, Texas
Project Number: 9402102g
Services:
Drilled belled pier observation
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled belled pier observation. See the attached sheet(s) for recorded data.
Technician: Gerry Graham
Report Distribution:
(1) Transwestern Commercial Services
(1) O'Brien & Associates Inc
(1) TechniStructures Inc
(1) City of Coppell - Constr Insp
(1) City of Coppell - Bldg Insp
(1) Hill & Wilkinson Ltd
(1) Halff Associates
(1) State Farm Insurance
Reviewed by:
HBC En.~
Eugene Harbour
Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical
materials.
Page 1 of 1 ~F,,~..~
REPORT OF SOIL-LIME MIXTURE PULVERIZATION
SgO) Cnt~mt~- Frwy., Suite 100
Dallas. Te~CL~ 75247
Date of Service: 04/02/02 Report No.:
Client No.: 3181 Project No.:
Client: Transwcstcm Commercial Services Project:
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
94021029.0176
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Contractor: Specification Requirements:
Test Location: Grid lines A to H and ] to 6 Minimum Passing 1 3/4" Sieve: ]00%
Minimum Passing ~4 Sieve: 60%
Sample Condition: Field Moist
lest Method: NTCOG
TEST 1-314" SIEVE t/4 SIEVE
NO. LOCATION % PASSING % PASSING
1 Grid line B.5/5, see attached sketch 100 67
2 Grid line D.5/5, see attached sketch 100 63
3 Grid line F.5/5, see attached sketch 100 64
4 Grid line C/3.5, see attached sketch 100 66
5 Grid line E/3.5, see attached sketch 100 65
6 Grid line G/3.5, see attached sketch 100 61
7 Grid line B/2, see attached sketch 100 63
8 Grid line D/2, see attached sketch 100 64
9 Grid line F/2, see attached sketch 100 66
Technician: B. Rengstorff
Report Distribution:
(1) Transwcstern Commercial Services
(1) O' Bricn & Associates, Inc.
(1) TcchniStructures, Inc.
(I) City of Coppell - Constr. Insp.
309
Engineering, Inc.
(1) City of Copp¢ll - Bldg. Insp.
(1) Hill & Wilkinson, Ltd. n ~,~/
(1) Halff Associates
(1) State Farm Insurance Euge
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without wrinen approval of HBC Engineering, Inc.