Amberpoint BP-LR020401 (2)REPORT OF SOIL-LIME MIXTURE PULVERIZATION
ENGINEEPdNG, INC.
8901 Carpenter Frwy., Suite I00
Dallas. Texas 75247
Date of Service:
Client No.:
Client:
04/01/02
3181
Transwestern Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0170
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. @ Coppell
Coppell, Texas
Contractor:
Test Location:
Gill Excavation
Grid lines H to Q and lines 1 to 6
Test Method: NTCOG
Specification Requirements:
Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing #4 Sieve: 60%
Sample Condition: Field Moist
TEST 1-3/4" SIEVE #4 SIEVE
NO. LOCATION % PASSING % PASSING
1 :Grid line I/5, see attached sketch 100 68
2 iGrid line K/5, see attached sketch 100 64
3 'Grid line M/5, see attached sketch 100 66
4 Grid line 0/5, see attached sketch 100 65
5 Grid line J.5/3.5, see attached sketch 100 64
6 Grid line L.5/3.5, see attached sketch 100 63
7 Grid line N.5/3.5, see attached sketch 100 62
8 Grid line P.5/3.5, see attached sketch 100 63
9 Grid line 1/2, see attached sketch 100 65
10 Grid line K/2, see attached sketch 100 62
11 Grid line M/2, see attached sketch 100 64
Technician: B. Rengstorff
Report Distribution:
(1) Transwestem Commercial Services
(1) O'Brien & Associates, Inc.
(1) TechniStructures, Inc.
( 1 ) City of Coppcll - Constr. Insp.
309
Engineering, Inc.
(1) City of Coppell - Bldg. Insp.
(l) Hill & Wilkinson, Ltd. ~
(1) Halff Associates
(1) State Farm Insurance Eugene Harbour
Principal
This report is exclusively for the use of the client indicated above and shall not be reproduced in full without written approval of HBC Engineering, [nc.
-f I