Loading...
Amberpoint BP-LR020329 (2)REPORT OF SOIL-LIME MIXTURE PULVERIZATION Date of Service: Client No.: Client: 03/29/02 3181 Transwestern Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: ENGINEERING, INC. 8901 Carpenter Frwy., Suite I00 Dallas. Texas 75247 94021029.0200 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Contractor: Test Location: Gill Excavation Grid lines A to Q and lines 6 to 7.2 Test Method: NTCOG Specification Requirements: Minimum Passing 1 3/4" Sieve: 100% Minimum Passing #4 Sieve: 60% Sample Con0ition: Field Moist TEST 1-3/4" SIEVE #4 SIEVE NO. LOCATION % PASSING % PASSING I Grid line C/6.5, see attached sketch 100 66 2 Grid line E/6.5, see attached sketch 100 64 3 Grid line G/6.5, see attached sketch 100 62 4 Grid line I/6.5, see attached sketch 100 63 5 Grid line K/6.5, see attached sketch i00 62 6 Grid line M/6.5, see attached sketch 100 63 7 Grid line 0/6.5, see attached sketch 100 64 Technician: B. Rengstorff Report Distribution: ( 1 ) Transwestern Commercial Services ( 1 ) O'Brien & Associates, Inc. (1) TechniStructures, Inc. ( I ) City of Coppell - Constr. Insp. 3091  lnc. (1) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance ELlgeIle Harbour Principal This repot[ is exclusively for the use of the client indica~d above and shall not be reproduced in full without written approval of HBC Engineering, Inc. - I