Loading...
Amberpoint BP-LR020404 (3)REPORT OF REINFORCING STEEL OBSERVATION . ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 04/04/02 Client No.: 3181 Client: Transwestern Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: 94021029.0185 Project No.: 94021029 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk @ Coppell Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Locations/Items Observed: Pier Caps 5/L, 5/M, 5/N, 5/0, 5/P and 1/3 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT iNCORRECT Placing D~'awings Approved X Bar Length and Shape X column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X propedy Tied X Rebar Clean X Dowel Bars in Piece Welded Splices Form Clean X Proper Bar Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Splices X Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: S. Campbell Report Distribution: Transwestern Commercial Services O.Brien& Associates, Inc. TechniStructures,/nc, City of Coppell - Constr. Insp. 30911w I--I]C Engineering, Inc. (l) City of Coppell - Bldg. Insp. . / (1) Hill & Wilkinson, Ltd. (l) Halff Associates (1) State Farm Associates Eugene Harbour Principal This report is exclusively for the use of the client indicated above and shall not be reproduced wthout wdtten approval of HBC Engineering, Inc