Loading...
Amberpoint BP-LR020405 (2)REPORT OF REINFORCING STEEL OBSERVATION Date of Service: 04/05/02 Client No.: 3181 Client: Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: 94021029.0192 Project No.: 94021029 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Services: Drawings Utilized: Locations/Items Observed: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Working Drawing 06/S3.1 and S2.1 Pier Caps at I/4, I/3 and I/2 and Slab-on-Grade, lines D to N and 5 to 7 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spar. J~g & Type Bar Size X Prop~ Bar Ptacement X Stin~p spacing & Type X Ear Grade X Propedy Trod X Rebat C~ean X Dowel Bars ~o Place X V~lded Splices Form Clean X Proper Bar Supports X Mechanical Splices Number of Bars X Proper Cover X Lapped Spikes Discrepancies/Comments: The following discrepancies were noted and corrected at the time of this observation. 1. The top of piers needed to be cleaned. 2. Pier cap cages needed to be centered prior to concrete placement. Field Results Report To: Technician: G. Grahalll Reoort Distribution: (1) Transwestem Commercial Services (1) O' Brien & Associa~s, inc. (1) TechniStructurcs, Inc. (1) City of Coppell - Coma'. lnsp. 309sks (1) City of Coppell - Bldg. Insp. ~ Engine. (1) Hill & Wilkinson, Ltd. (1) Halff Associates (I) State Farm Insurance Eugene Harbour Principal