Amberpoint BP-LR020405 (2)REPORT OF REINFORCING STEEL OBSERVATION
Date of Service: 04/05/02
Client No.: 3181
Client: Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.: 94021029.0192
Project No.: 94021029
Project: Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Services:
Drawings Utilized:
Locations/Items Observed:
Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Working Drawing 06/S3.1 and S2.1
Pier Caps at I/4, I/3 and I/2 and Slab-on-Grade, lines D to N and 5 to 7
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spar. J~g & Type
Bar Size X Prop~ Bar Ptacement X Stin~p spacing & Type X
Ear Grade X Propedy Trod X
Rebat C~ean X Dowel Bars ~o Place X V~lded Splices
Form Clean X Proper Bar Supports X Mechanical Splices
Number of Bars X Proper Cover X Lapped Spikes
Discrepancies/Comments: The following discrepancies were noted and corrected at the time of this observation.
1. The top of piers needed to be cleaned.
2. Pier cap cages needed to be centered prior to concrete placement.
Field Results Report To:
Technician: G. Grahalll
Reoort Distribution:
(1) Transwestem Commercial Services
(1) O' Brien & Associa~s, inc.
(1) TechniStructurcs, Inc.
(1) City of Coppell - Coma'. lnsp.
309sks
(1) City of Coppell - Bldg. Insp. ~ Engine.
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(I) State Farm Insurance Eugene Harbour
Principal