Amberpoint BP-LR020402 (2)REPORT OF SOIL-LIME MIXTURE PULVERIZATION
Date of Service:
Client No.:
Client:
04/02/02
3181
Transwestem Commercial Services
5001 Spring Valley Rd, Suite 600 W
Dallas, TX 75244
Report No.:
Project No.:
Project:
94021029.0176
94021029
Amberpoint Building No. 1
Amberpoint Bus. Pk. ~ Coppell
Coppell, Texas
Contractor:
Test Location:
Grid lines A to H and 1 to 6
Specification Requirements:
Minimum Passing 1 3/4" Sieve: 100%
Minimum Passing ~g4 Sieve: 60%
Sample Condition: Field Moist
Method: NTCOG
TEST 1-314" SIEVE ft4 SIEVE
NO. LOCATION % PASSING % PASSING
1 Grid line B.5/5, see attached sketch 100 67
2 Grid line D.5/5, see attached sketch 100 63
3 Grid line F.5/5, see attached sketch 100 64
4 Grid line C/3.5, see attached sketch 100 66
5 Grid line E/3.5, see a_n~ched sketch 100 65
6 Grid line G/3.5, see attached sketch 100 61
7 Grid line B/2, see attached sketch 100 63
8 Grid line D/2, see attached sketch 100 64
9 Grid line F/2, see attached sketch 100 66
Technician: B. Rengstorff
Report Distribution:
(1) Transwcstern Commercial Services
(1) O' Brlcn & Associates, Inc.
(1) TcchniStmctums, Inc.
{1) City of Coppell - Constr. lnsp.
309
(1) City of Coppell - Bldg. Insp.
(1) Hill & Wilkinson, Ltd.
(1) Halff Associates
(1) State Farm Insurance
Engineering, Inc.
Eugene-~arbour
Principal
This repo~ is exclusively for the use of the client indicated above and shall not Ix: reproduced tn full w~thout .,~mnon approval of HBC Engineering, Inc