Loading...
Amberpoint BP-LR020402 (2)REPORT OF SOIL-LIME MIXTURE PULVERIZATION Date of Service: Client No.: Client: 04/02/02 3181 Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: Project No.: Project: 94021029.0176 94021029 Amberpoint Building No. 1 Amberpoint Bus. Pk. ~ Coppell Coppell, Texas Contractor: Test Location: Grid lines A to H and 1 to 6 Specification Requirements: Minimum Passing 1 3/4" Sieve: 100% Minimum Passing ~g4 Sieve: 60% Sample Condition: Field Moist Method: NTCOG TEST 1-314" SIEVE ft4 SIEVE NO. LOCATION % PASSING % PASSING 1 Grid line B.5/5, see attached sketch 100 67 2 Grid line D.5/5, see attached sketch 100 63 3 Grid line F.5/5, see attached sketch 100 64 4 Grid line C/3.5, see attached sketch 100 66 5 Grid line E/3.5, see a_n~ched sketch 100 65 6 Grid line G/3.5, see attached sketch 100 61 7 Grid line B/2, see attached sketch 100 63 8 Grid line D/2, see attached sketch 100 64 9 Grid line F/2, see attached sketch 100 66 Technician: B. Rengstorff Report Distribution: (1) Transwcstern Commercial Services (1) O' Brlcn & Associates, Inc. (1) TcchniStmctums, Inc. {1) City of Coppell - Constr. lnsp. 309 (1) City of Coppell - Bldg. Insp. (1) Hill & Wilkinson, Ltd. (1) Halff Associates (1) State Farm Insurance Engineering, Inc. Eugene-~arbour Principal This repo~ is exclusively for the use of the client indicated above and shall not Ix: reproduced tn full w~thout .,~mnon approval of HBC Engineering, Inc