Loading...
ST0001-LR020416 (2)Client: City of Coppell ACm: Ms. Susan Taylor - Engineering Dept PO Box 478 Project: ~ Services: 'lq~ql~lll?Pl'~-~nsity Test in accordance with ASTM Standards. 8908 Ambassador Row DaRns, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Report No.: 147396 Project No.: 015729 Date of Service: 04/10/2002 Report Date: 04/16/2002 CONTRACTOR: Test Methods: Infrastructure Services, Inc. ASTM D-2922 ASTM D-3017 PROJECT DATA Gauge: Troxler 3430 Gauge Serial No: 32685 Test Mode: DT M/DNo. Descdpfion Moisture Current: 604 Previous: 642 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Dark Brown Clay (Lime Treated) Standard Counts Density Current: 3106 Previous: 3027 Project Requirements Moisture Density 31.0 85.0 Optimum +5 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION Paving Subgrade 1 Creekview, Station 9+00 at center line Paving Subgrade 2 Creekview, Station 11+00 left of center line Paving Subgrade 3 Creekview, Station 13+00 right of center line Paving Subgrade 4 Creekview, Station Paving Subgrade 5 Creekview, Station Paving Subgrade 6 Creekview, Station 19+00 right of center line PROBE DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcO (pcf) (% max) 6" 1 46.7* 109.3 74.5 6" 1 33.4 111.0 83.2 6" 1 34.8 109.7 81.4 98 96 15+00 at center line 6" 1 34.2 111.8 83.3 98 17+00 left of center line 6" 1 35.5 112.2 82.8 97 6" 1 33.4 113.9 85.4 100 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07DF Page 1 of 2 Report No.: 147396 RoneEngineers Project No.: 015729 Client: City of Coppell la ............ ~lll An asterisk (*) appears next to test results which do NOT meet the project speci~o/~ Technician: JoeJernigal~. Started: 7:00AM Finished: 9:00AM golle~~~'~ Report Distribution: (1) City of Coppell (1) City of Coppell (I) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Clay S~ark (1) City of Coppell (1) hafi'astructure Services, Inc. Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.)or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 07DF Page 2 of 2