Deforest Court-LR020423REPORT OF DRILLED PIER OE ~RVATION
Report Number: 94021129.0007
Service Date: April 17, 2002
,jf~l~Tgle Family Home/
[ ~'632 DeForest Cou~j~
:t~021129
Client: The Holmes Builders
Attn: Dean Trudell
1406 Halsey Way Suite 100
Carrollton TX 75007
Re
Pro
Projec
ENGINF~ERI~G
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Services:
Drilled pier observation
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled pier observation. No pier drilling was done on this date due to jobsite conditions were too
wet to drill.
Technician: Phil Green
Report Distribution:
(1) The Holmes Builders
(1) City of Coppell - Constr Insp
(1) City of Coppell - Bldg Insp
Reviewed by:
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods~ This repod is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1 ~LLW~"~.".,