Loading...
Deforest Court-LR020423REPORT OF DRILLED PIER OE ~RVATION Report Number: 94021129.0007 Service Date: April 17, 2002 ,jf~l~Tgle Family Home/ [ ~'632 DeForest Cou~j~ :t~021129 Client: The Holmes Builders Attn: Dean Trudell 1406 Halsey Way Suite 100 Carrollton TX 75007 Re Pro Projec ENGINF~ERI~G 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Services: Drilled pier observation On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. No pier drilling was done on this date due to jobsite conditions were too wet to drill. Technician: Phil Green Report Distribution: (1) The Holmes Builders (1) City of Coppell - Constr Insp (1) City of Coppell - Bldg Insp Reviewed by: Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods~ This repod is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 ~LLW~"~.".,