Deforest Court-LR020419REPORT OF DRILLED PIER O[ _=RVATION Report Number: 94021129.0002 Service Date: April 5, 2002 Client: The Holmes Builders Attn: Dean Trudell 1406 Halsey Way Suite 100 Carrollton TX 75007 Services: Drilled pier observation. PJ~jJ~t: Single Family Home I ~, 632 DeForest Cou,/ ~ % Coppell, Texas/ Pr~umb~129 , technician arrived at the above~ite as scheduled for On this date, an HBC Engineering drilled pier observation. After unsuccessful attempts to drill piers~rn Lot ~¢1~,.~e pier drilling operation was cancelled. The pier drillers were unable to drill the~lia,r,~the two (2) options provided by the structural engineer on the plans. The materials were too soft to bell the piers at 13 feet below the surface and unable to maintain a clean hole by drilling to the gray shale. HBC's project manager, Hussein Abusaad, informed the structural en~eer of the situation. Technician: Phil Green Report Distribution: HBC Engineering (1) The Holmes Builders Reviewed by: ~ (1) City of Coppeil - Constr Insp Hussein H. Abusaad, P.E. (1) City of Coppell - Bldg Insp Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 REPORT OF DRILLED PIER OE'-':RVATION Report Number: 94021129.0003 Service Date: April 5, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: The Holmes Builders Attn: Dean Trudell 1406 Halsey Way Suite 100 Carrollton TX 75007 Report Date: April 19, 2002 Project: Single Family Home 632 DeForest Court Coppell, Texas Project Number: 94021129 Services: Drilled pier observation. On this date, an HBC Engineering engineer arrived at the above referenced jobsite to observe the pier drilling operation. The pier drilling operation was cancelled after attempts to drill holes in accordance with the approved plans failed. Mr. Brian Powell with HBC Engineering's Geotechnical Department, the structural engineer and HBC's client, Mr. Dean Trudell were informed of the situation. Technician: Hussein H. Abusaad, P.E. Report Distribution: H~ering (1) The Holmes Builders Reviewed by: (1) City of Coppe[I - Constr Insp Hussein H. Abusaad, P.E. (1) City of Coppell - BIdg Insp Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1