Services: Drilled pier observation.
PJ~jJ~t: Single Family Home
I ~, 632 DeForest Cou,/
~ % Coppell, Texas/
Pr~umb~129 ,
technician arrived at the above~ite as scheduled for
On
this
date,
an
HBC
Engineering
drilled pier observation. After unsuccessful attempts to drill piers~rn Lot ~¢1~,.~e pier drilling
operation was cancelled. The pier drillers were unable to drill the~lia,r,~the two (2) options
provided by the structural engineer on the plans. The materials were too soft to bell the piers at
13 feet below the surface and unable to maintain a clean hole by drilling to the gray shale. HBC's
project manager, Hussein Abusaad, informed the structural en~eer of the situation.
Technician: Phil Green
Report Distribution: HBC Engineering
(1) The Holmes Builders Reviewed by: ~
(1) City of Coppeil - Constr Insp Hussein H. Abusaad, P.E.
(1) City of Coppell - Bldg Insp Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1
REPORT OF DRILLED PIER OE'-':RVATION
Report Number: 94021129.0003
Service Date: April 5, 2002
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Client: The Holmes Builders
Attn: Dean Trudell
1406 Halsey Way Suite 100
Carrollton TX 75007
Report Date: April 19, 2002
Project: Single Family Home
632 DeForest Court
Coppell, Texas
Project Number: 94021129
Services: Drilled pier observation.
On this date, an HBC Engineering engineer arrived at the above referenced jobsite to observe the
pier drilling operation. The pier drilling operation was cancelled after attempts to drill holes in
accordance with the approved plans failed. Mr. Brian Powell with HBC Engineering's Geotechnical
Department, the structural engineer and HBC's client, Mr. Dean Trudell were informed of the
situation.
Technician: Hussein H. Abusaad, P.E.
Report Distribution: H~ering
(1) The Holmes Builders Reviewed by:
(1) City of Coppe[I - Constr Insp Hussein H. Abusaad, P.E.
(1) City of Coppell - BIdg Insp Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1