Loading...
Amberpoint BP-LR020425REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0217 Service Date: April 16, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 25, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services: Drilled Belled Pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for belled drilled pier observation. See the attached sheet(s) for recorded data. Technician: Gerry Graham HBC E~ Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell - Bldg Insp Reviewed by: (1) O'Brien & Associates Inc (1) Hill & Wilkinson Ltd Eugene Harbour (1) TechniStructures Inc (1) Halff Associates Principal (1) City of Coppell - Constr Insp ' (1) State Farm insurance The tests were performed in general accordance with applicable ASTM, AASHTO, or L~L~ zest me~noos. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 REPORT OF DRILLED BELLED PIER OBSERVATION Report Number: 94021029.0219 Service Date: April 16, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: April 25, 2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Services; Drilled belled pier observation On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled belled pier observation. See the attached sheet(s) for recorded data. Technician: Steve Campbell HBC Engi e~~ Report Distribution: (1) Transwestern Commercial Services (1) City of Coppell - Bldg Insp Reviewed by: (1) O'Brien & Associates loc (1) Hill & Wilkinson Ltd Eugene Harbour (1) TechniStructures Inc (1) Halff Associates Principal (1) City of Coppell - Constr Insp (1) State Farm Insurance The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repot[ is exclusively for the use of the c{ient indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the propedies of other apparently similar or identical materials. Page 1 of 1 LLI