Loading...
PA9702-LR 991019 (3)CONCRETE COMPREC"S IVE STRENGTH TES ENGINI~_.I~G, INC. 8901 Carpenter Frwy, Snite#100 I)sllas, Texas 75147 Date of Service: 09/17/1999 Report No.: 9925287 Report Date 10/19/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell, Texas/Prj. ~605 1 Coppell TX 75019 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers pLACEMENT DATE: 09/17/1999 BATCH TIME: 8:30am pLANT: Lewisville TIME SAMPLED: 9:40am BY: Mike Shields SPECIFICATION REQUIREMENTS W~ATItER CONDITIONS: Sunny 8TRENGTIt: 4000 psi @ 28 Days TEMPERATURE (F)- Am 73 F CONCREW: 83 F SLUMP: 5-7" TRUCK NO: 220 ~Cr~r NO: 77739 Am: N/A Amco~rrgsr(~): N]A UNITWEIGItT(p~: N/A TEST M~'raOD: ASTM C-143 PtACEM~NT LOCATION: Pier information and technician time: See Report ~9925286 ASTM C-172 ASTM C-39 SAMPLE LOCATION: Pier P/2 REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 09/24/1999 7 108100 3820 1 2 5.50 09/24/1999 7 103460 3660 Average 3740 1 3 5.50 10/15/1999 28 149680 5290 1 4 5.50 10/1511999 28 154910 5480 Average 5390 Technician: Mike Shields Started: Finished: ~//_~Engineering, Inc- Report Distribution: (1) City of Coppell (1) City of Coppell - Engineering (1) BrinkIcy Sargent Architects (1) City of Coppell - Bldg. lnsp. Eugene Hatbout (1) Tamer Engineers (1) City of Coppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This rcpoR is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of I