Loading...
Meadow Ridge-CS020416T ,H E C I T Y · 0 F COPPELL P.O. Box 478 255 Pantway Bird Coppell, TX 75019 Phone: (972)304,-.3679 Fax: (972)304-3570 ENGINEERING DEPARTMENT To-' FAX CO VER SHEET P~x~ t( ~ t ~ U~ent (including cover sheet) []For Review [] Please Comment [] Please Reply [] As Requested .Comments: IF YOU DO NOT RECEiVE ALL OF THE PAGES pLFXSE CALL (972) 304-3679 "CIO, of Coppell Engineering- Excellence By Design DEVELOPMENT FEE TABLE Project: Irrigation at Meadowridge Townhomes Date: 04/12/2002 .... I~ES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee " $6,720.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $615.84 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100 % due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100 % due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 '(100% due prior to Council Approval) Street Light Fee Information not Available (100 % due prior to Acceptance of Project) Street Sign Fee Information not Available (100 % due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100 % due prior to Start of Construction) ITOTAL $7,575.84 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 PROJECT: DATE: Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): DEVELOPMENT FEE WORKSHEET l~4t~;ti/;;~ Meadowridge Townhomes 0 - 2 inch = 0 ESU's 3 - 2 inch = 24 ESU's 0 = 0 ESU's Fireline Meter(s): 0 - 8 inch = 0 ESU's Total #: 24 ESU's @ $280.00 ea. (Due prior to issuance of building permit) $6,720.00 Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 3 Irrigation Meter(s) @ $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) $150.00 $0.00 $615.84 $0.00 $0.00 $o.oo $90.00 $o.oo $o.oo $o.oo Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $280.00 ea. (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. Page 1 DEVELOPMENT FEE WORKSHEET (100% due prior to issuances~j~ ~i~..~g ~lu ~ ' rm[: ~)' ~'*~. ~j~ '~ Developments O~ly)~ ~ ~ ~ ' * Prelimina~ plat approved: After October 26, 1993 Park Development Zone: 0 Single-family ~ $1,285.00 per lot $0.00 0 Multi-family ~ $1,285.00 per unit $0.00 (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) $0.00 Information not Available Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Irrigation at Meadowridge Townhomes 04/12/2002 ROADWAY IMPACT FEE: Service Area * 5 Category ** Residential Land Use ** No. Lots/Units 0 Development Units ** 0.00 Vehicle Miles per Development Unit ** 0 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = Multi-Family $0.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)