Meadow Ridge-CS020416T ,H E C I T Y · 0 F
COPPELL
P.O. Box 478
255 Pantway Bird
Coppell, TX 75019
Phone: (972)304,-.3679
Fax: (972)304-3570
ENGINEERING DEPARTMENT
To-'
FAX CO VER SHEET
P~x~
t( ~ t
~ U~ent
(including cover sheet)
[]For Review [] Please Comment [] Please Reply [] As Requested
.Comments:
IF YOU DO NOT RECEiVE ALL OF THE PAGES pLFXSE CALL (972) 304-3679
"CIO, of Coppell Engineering- Excellence By Design
DEVELOPMENT FEE TABLE
Project: Irrigation at Meadowridge Townhomes
Date: 04/12/2002
.... I~ES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee " $6,720.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $615.84
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100 % due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100 % due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $0.00 $0.00
'(100% due prior to Council Approval)
Street Light Fee Information not Available
(100 % due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100 % due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100 % due prior to Start of Construction)
ITOTAL $7,575.84
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
PROJECT:
DATE:
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
DEVELOPMENT FEE WORKSHEET
l~4t~;ti/;;~ Meadowridge Townhomes
0 - 2 inch = 0 ESU's
3 - 2 inch = 24 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 - 8 inch = 0 ESU's
Total #: 24 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
$6,720.00
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 3 Irrigation Meter(s) @ $205.28
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
$150.00
$0.00
$615.84
$0.00
$0.00
$o.oo
$90.00
$o.oo
$o.oo
$o.oo
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $280.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
Page 1
DEVELOPMENT FEE WORKSHEET
(100% due prior to issuances~j~ ~i~..~g ~lu ~ ' rm[: ~)' ~'*~. ~j~ '~
Developments O~ly)~ ~ ~ ~ '
* Prelimina~ plat approved: After October 26, 1993
Park Development Zone:
0 Single-family ~ $1,285.00 per lot $0.00
0 Multi-family ~ $1,285.00 per unit $0.00
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
$0.00
Information not Available
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Irrigation at Meadowridge Townhomes
04/12/2002
ROADWAY IMPACT FEE:
Service Area * 5
Category ** Residential
Land Use **
No. Lots/Units 0
Development Units ** 0.00
Vehicle Miles per Development Unit ** 0
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
Multi-Family
$0.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)