Loading...
Wynnpage Plaza-CS020129BENTLEY ENGINEERING, INC. CIVIL ENGINEERiNG · PLANNING CONSTRUCTION MANAGEMENT MARC O. BENTLEY, P.E. January 29, 2002 Mr. Kenneth M. Griffin, P.E. Director of Engineering & Public Works City of Coppell 255 Parkway Coppell, Texas 75019 Re: Wynnpage Plaza - Phase II BEI No. 22108 Dear Mr. Griffin: Attached are two (2) sets of the site development plans for the referenced project. We are submitting these plans for your review and comments. We are requesting that the on-site pavement be 6 inch thick 4000 PSI reinforced concrete pavement with #3 rebar on 18 inch centers in both directions on 6 inch com- pacted subgrade. This request is being made in lieu of lime stabilizing the subgrade. We would appreciate your consideration of our alternate paving section. If you should have any questions or concerns, please do not hesitate to call. Sincerely, BENTLEY ENGINEERING, INC. Marc O. Bentley, P.E. Attachment 702 GATEWOOD DRIVE GARLAND, TEXAS 75043 (972) 240-4821 FAX (972) 240-0922