Loading...
ST9401-CS 990129'~"'~'~ JAN-29-99 FRI 03:55 PM REBO% January 29, 1999 P.O. Box 4?8 CoppelI, Texas 75019 FAX NO. 9724448234 ,' _J P, 02/10 Re: .Denton Tap Road Cottonwood Creek to S .H. 121 Bypass Dear Garreth: I have reviewed the latest plan revision received from Wier & Associates regarding the referenced project, and I have summarized the changes on the enclosed sheets. Three of the enclosed sheets are a hand written r~view of the changes on a sheet by sheet basis, and one of the enclosed sheets shows Rebcon's proposed quantity and price revisions caused by the changes. The other enclosed sheets were submitte~d by Craig Olden, Inc. to substantiate their request for an increased fabric price. I have contacted all of the affected subcontractors and suppliers ( North Texas Contracting, Mica, Mel's Electric, Paver Construction, and Gordon's Specialties) review the revised plans. Gordon's Specialties is using the same basic design as the handrail shown on original plan sheet 34, so the unit price for the base bid handrail now matches the unit price for the alternate handrail. The handrail is composed of 1 square posts on 8' centers, 1 W' horizontal members, and W' square pickets on 4" centers. Gordon's Specialties will submit shop drawings based on this design if it meets your approval. We have changed the unit price of Change Order No. 1 Special Rail because the quantity has been reduced by 30% due to the elimination of the two median bridge rails. The unit price has been increased 15.7% to recover our fixed costs which remain the same, and these have been pro-rated into the remaining footage of the Special Rail. We have added the increased costs to form and clean-up the bridge deck due to connecting the two bridges. W6 will now have to work from underneath the bridge to construct this portion of the slab which greatly increases the difficulty of the construction. We will subcontract the placement and removal of the temporary concrete barrier rail and the temporary barrel mounted guard fence to Mica Corporation. Their unit price is greatly affected by the small amount of concrete barrier nil required. 'The additional Prepare R.O.'W. and fill was necessitated by the elimination of the gravity retaining wall on the west side of the road shown on sheet 7. I have created a nc-,v itcrn DALLAS, TEXAS 758~!0 972/444~8230 03:56 PH REBOON, INC FA× NO. 9724448234 for the concrete pavers on the bridge deck median, because the oril~,inal concrete paver price includes the concrete und61'neath the pavers. The 3" Conduit Bored price is necessary because the concrete pavement has already been constructed where this conduit is to be placed. Please review the enclosed summaries, and let mc know if it meets your approval. I nccd to send Mica a Subcontract as soon as possible to reserve their concrete barrier and to schedule their work. Sincerely, REBCON, 1NC. l~ober~ C. Bibby enclosures P. 03/10 ~!':3AN-2S-S9 FRI 03=57 PH REBCON, ::>'' /',/~ J' C,L"---,)~.- 'T :' ' FAX NO. 9724448234 P. 04/lO ,,,... ,~/'~ /cO ' ] ' ~9-99 FRI 03:57 PH REBOON, -; F~X NO, 9724448234 P. 05/lO JAN-29-99 FRI 03:59 PH 9724448234 REB("'~, INC FAX NO. 97T~48234 ..... P. pl/O5 '~:.;dRN-29-99 FRI 04:00 PH -ZT99(FRt) 08=08 CRAIG OLD Olden, :lRnuary 21, 1999 R~BCON, INC. 1,868 W. Northwest Ktghway Dallas, Texas 75220 Attention: Mr. Robea Bibby FAX: 972.444,$234 REBCON, INC ""l' INC. FAX NO, 9724448234 TEL:I 972 2~ 664 Specialists in Crcrbion Cons~nzction ~azth Retention Systems Oeotextile for Gabion Installation Denton Tap Road -City of Coppel|, Texas COINC No. 98-58 P, 03/05 P. OO2 ;. .: As per your request, please find artached copies o$ our invoices from Carthage Mills "Carthage 30%" and Maccaferri for ~ 140 Bootextiles. We had originally submitted Our proposal using Maccaferri's ,.MX 140 g~otexUle (typical geotextile used on gabion projects). MX 140 is priced $0,38 per square yard. The Carthage 30% geotexti/e. which is the revised type ofgeotextile per Wier and Associates memo dated 8/3/98. is $1.60 per square yard. We are r~uesting compensation for the additional cost of $I.25 ($1.60 - $0.38 X 3% Marlcup) per square yard tbr the Carthage 30% geotextile. We esitmated the job quantity of geotextile to be approximately 1,200 5Y; therefore, we are requesting an additional $1,500.00. Lf you have any questions, please contact me. Yours truly, Clndy l-Ioli~e[d ~ Construction Operations CH:ch , Attachmenu · Little Elm. Texas 75068 - Dallas 872 / 294-50130 - 1-800-GABIONS · FAX S7Z / 254-2864 · www, gabion.~-am ~,--99 FR! 04:01. PII REBOON, '.:~9(F I) 08: O~ :.!=:'::I R CRAIG OLP'~,, INC. Carthage Mills :,:" Bill To: r-.rT2LE ~,T,,~, TX 750S8- Ship To: F~X NO. 9724448234 TEL:I 972 l°""!664 P. 04/05 P. 005 Iavoic= No. Invoica Dat~-: Page No: 823990 08/25/98 i CRAi. G 661 SlgaD~N ,~RA;RIII LITTLE ltr,,N, 'IX 75068 :. ,. ..... ,N~. '.. :.: . .~..~ --..., ....... Qty ' Unit 800.0O sr 6~0.00 SY ~rF of: S% IMr d~y 01% nnuall)) wilX be :hug'~i a,, ,~= _,,., .Subtotal .- -...,~ ,:... ". 2,336.00 .-2,336.00 ~ank You for Your Order, FR I 04: 02 PH .:':ZZ 99(FR[) 08:08 REBCON, INC CRAIG 0LD""'~,INC. ~ ~;TX 403~ :.~ C~A;G OLDEN ZNC ........... P Q 9QX ~OO .. CRAIG Q'L, DEN iNC 'L~.TTLE ~"LM TX ?5068 FAX N0. 9724448234 TEL:I 97Z 29""664 P, 05/05 P, 004 MACCAFERRI clltl~.INAk INVOIGi .. INVOICE NO. ~- -54 ~- i 6 .~RMS: NeT 30 nAYS Service charge ~f 1Y~% (19% ~e r ~nnum) On ba~e ~ d~e. INCLUDE INVOICE NUMiER ON YOUR REMII=rANCE, ~Y .__ ?/31/~8 J , ~ · 3~0 1,140.O0 I : ; ; APPROVED SUB-TOTAL l, 140. O0 TOTAL [sUE I, 140. O0 : I. TE:RRTTORY ~, T"X, ; :' O~rER ~ ~455~, PROJECT: DENTON-TAP ROAD LOCATION: COPPELL ITEM 2 3 2~ 32 32~ 33 35 35a 62~ 12 14 CO~1 C(M1 CO~la DESCRIPTION CTRL DENSITY FILL : IMPORT SANDY CLAY BORROW MAT ADDITIONAL ROW PREP B RICK PAVE RS ON BRIDGE DEC K PULL SERV BOX 3" SCH 40 PVC PiPE CONDUIT 3" SCH, 40 PVC PIPE CONDUIT BORED 0-4' TALL GRAVITY RETAIN WALL & TREE WELLS 4'-6' TALL GRAVITY RETAI. N WALL & TREE WELLS PED HANDRAIL NEW FED HANDRAIL METER VAULT FOR 2' AIR RELEASE VALVE 6" 3000W REINF CONC RIP RAP 16" DtA CONC PIERS CONC FOR BRIDGE ABUT CONC FOR SLABS CONC FOR BRIDGE CURB & SW SPECIAL BRIDGE RAILS - BRIDGE SPECIAL BRIDGE RAILS - ALT SFECIAL BRIDGE RAILS - BRIDGE SPECIAL BRIDGE RAILS -ALT WASTED REBAR DUE TO BRIDGE CHANGE TEMP CONC BARRIER RAiL TEMP BMGF CHANGE GABION FABRIC ADD'L SLAB FORM & WRECK COSTS UNIT CY :CY LS SY LF LF LF LF LF LF SY LF CY CY CY LF LF LF LF LB LF LF SY SF' PREVIOUS, CHANGED - NET UNIT PREVIOUS CHANGED NET QTY QTY CITY PRICE TOTAL TOTAL TOTAL 26991.0 180.0 27171.0 $6.00 $161,946.00 $1,080.00 $163,026.00 23601.0 180.0 23781.0 $6.00 $141,606.00 $1,080.00 S 142,666,00 O.O 1.0 1.0 $3,600.00 $0.00 $3,600.00 $3,600.00 0.0 182.0 182.0 $39.00 $0.00 $7,098.00 $7,098.00 6.0 4.0 10.0 $300.00 $1,800.00 $1,200.00 $3,000.00 601.0 2 t 8.0 819.0 $4.00 $2,404.00 $872.00 $3,276 0.0 110.0 110.0 $19.60 $0.00 $2,156.00 $2,156.00 290.0 -183.0 107.0 $85.00 $24,650.00 ($15,555.00) $9,095.00 198.0 -37.0 161.0 $150.00 $29,700.00 ($5,550.00) $24,150.00 382.0 -382.0 0.0 $23.00 $8,786.00 ($8,786.00) SO.GO 0.0 104.0 104.0 $60.00 $0.00 $6,240.00 $6,240.00 0.0 1,0 1.0 $900.00 $0.00 $900.00 $9OO.00 1557.0 21.3 1578.3 $45.00 $70,065.00 $958.50 $71,023.50 448.0 -56.0 392.0 $130.00 $58,240.00 ($7,280.00) $50,960.00 174.4 -12,9 161.5 $550.00 $95,920.00 ($7,095.00) $86,825.00 524.5 16.2 540.7 $380.00 $199,310.00 $6,156.00 $205,486,00 189.2 -15,6 173.6 $200.00 $37,840.00 ($3,120.00) $34,720,00 1487.0 -1487.0 0.0 $217.00 $322,679.00 ($322,679.00) $0.00 76.0 -76.0 0.0 $217.00 $16,492.00 ($16,492.00) $0.0~ 0.0 1014.0 1014.0 $251.00 $0.00 $254,514.00 $254,514.00 0.0 76.0 760 $251.00 $0.00 $19,076.00 $19,076.00 0.0 587,0 587,0 $0.30 $0.00 $176. t0 $176.10 0.O 210.0 210.0 $29.00 $0.00 $6,090,00 $6,090.00 0.0 100,0 100,0 $26.00 $0.00 $2,600.00 $2,600.00 1200.0 0.0 1200.0 $1.38 $1,656.00 $0.00 $1,656.00 0.0 1175,0 . 1175,0 ~ $9.35 $0.00 $10,986.25 $10,988,25 1,t73,094.00 {61,774,15) 1,'t11,319.65