Loading...
Valley R Plaza 2B-CS020109255 Parkway Blvd. Coppell, Texas 75019 Fax To: Paul Vemon From: Teresa Tumer ~ Fax: 214-891-3232 Pages: 2 include this sheet Phone: Date: 01/09/02 Re: Valley Ranch Plaza II CC: Gary Johnson, Asst. City Engineer,' [] Urgent [] For Review [] Please Comment [] Please Reply [] Please Recycle Mr. Vemon: As you requested, the engineering division has reviewed the as-built plans for the original development of Valley Ranch Plaza. These plans are dated 9/26/1997 and they do not include specific civil details related to Pad B, the site you are currently looking to develop. In addition, the City of Coppell's Subdivision Ordinance requires that construction plans must be resubmitted if construction does not commence within one year of being approved by the city. I have included the engineering department's general guidelines for the plan review process. It may be possible for you to apply for an eady grading permit while the construction plans are under review. Please see the section labeled "After Site Plan and Final Plat approval by Planning and Zoning Commission" for specific guidelines. If you have any fur[her questions concerning these requirements, please contact me at 972- 304-3681. T H I[ * C I T Y · 0 F COPPELL , ~ ~~-~-o ENGINEERING PLAN REVIEW PROCESS* ~ ~ · ' CITY OFCOPPELL DRC Review · Engineering will review development plans for major issues concerning right-of-way, easements, utilities, floodplains and other project-specific engineering issues. traffic, iAfter approval by Planning and Zoning Commission Site Plan and Final Plat Engineering Department will consider approval of early grading. I. Submit grading plans for review including: cover sheet, plat, grading plan, and erosion control sheets. 2. [f approved, pay grading inspection fees (provide copy of contract to Engineering Dept.); grading inspection fees will be calculated as 2% of grading contract cost. 3. Complete early grading permit at Engineering Dept. and provide copy of N. O. Z 4. Developer/owner holds City harmless for any adjustments in grading identified during plan review/Council action if commencing early grading. 5. Grading preconstruction conference required prior to commencing dirt work. After Site Plan and Final Plat approval by City Council · Submit civilplansfor review ('see Subdivision Ordinance for required elements ofcivilplans) Review will not begin until.final plat approval by City Council. Allow 2-3 weeks for each plan review and expect 2+ iterations. · Schedule meeting with Engineering staff to resolve major issues. · Impact fees are assessed by the Engineering staff and submitted in writing to Project Engineer. 1. Plat will not be processed for signatures before roadway & park impact fees (if applicable) are paid. Please note that under Senate Bill 243, the Texas Legislature delayed the collection of Water and Sewer Impact fees until the issuance ora Building Permit. Water and Sewer impact fees are to be paid to the Building Inspections Department, 500 Southwestern Blvd. 2. Plans will not be approved before payment of roadway & park impact fees (if applicable) and inspection fees (provide copy of contract to Engineering Dept.); inspection fees will be calculated at 2% of contract cost for private work and 4%for work in the public right-of-way or easements. After approval of Engineering Plans · Plans will be signed and stamped by Engineering staff. · Preconstruction conference required prior to be,ginning construction. Possible delays in the Plan approval process · Floodplains: Development must comply with the City of Coppell Floodplain Management Ord#mnce. 1. Will a LOMR be required? If so, allow time for the review of these studies by the City and FEMA. Development may commence upon receipt of CLOMR from FEMA. 2. Will a LOMA be needed? If so, work directly with FEMA. Work may commence upon receipt of LOMA from FEMA. · Corps of Engineers, CDC and EPA permitting - allow time for the permitting process; provide copy of NOI to City prior to commencing work. · Right-of-way use agreements, off-site easements, public improvement districts and otherproper~.' agreements - allow time for these processes. *NOTE: This checklist is general in nature and for informational purposes only. For specific engineering requirements, see the City of Coppell Subdivision Ordinance, Floodplain Management Ordinance and Standard Construction Details. Forms/planreview Revised 1/02