Deforest Court-LR020430REPORT OF DRILLED PIER OBSERVATION
Report Number: 94021129.0009
Service Date: April 18, 2002
L~4GINEERING
8901 Carpenter Frwy., Suite #100
Dallas, Texas 75247
(214) 630-1010
Client: The Holmes Builders
Attn: Dean Trudell
1406 Halsey Way Suite 100
Carrollton TX 75007
Report Date: April 30, 2002
Project: Single Family Home
632 DeForest Court
Coppell, Texas
Project Number: 94021129
Services:
Drilled pier observation.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
Technician: Phil Green
Report Distribution:
(1) The Holmes Builders
(1) City of Coppell - Constr Insp
(1) City of Coppell - Bldg ]nsp
Reviewed by:
HBC~ring
Hussein H. Abusaad, P.E.
Senior Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This repod is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1 ~s~9~.