CF-Coppell Rd SC-LR020424 (2)Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS '~
CLIENT: Texas Unified Constructors, Inc.
PROJECT: Yield Service O~fices & Maint~ Fac., Coppell
JOB NO.:
DATE:
SUPPLIER:
01.1054
24 April 2002
Lattimore
LOCATION OF POUR SET 1: Wall panels for fence at chamical bldg.: #36, 37 and 38
LOCATION OF POUR SET 2:
SAMPLE DATA: SET 1 SET 2 MiX NO.
Truck No. 830 Cement
Ticket No. 3143627 Flyash
Time Batched 8:35am Sand
Time Sampled 9:30am in,
Concrete Temp. (ASTM C1064) 84°F 1.0 in.
Air Content (ASTM C231) 4.5% Water
Unit Weight (ASTM C138) Admix #1
Admix #2
AEA
65
COMPRESS/VE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load
Number Inches Days Date Pounds
(ASTM C143)
222 5,25 ~ 7~ 05/01/02 97,500
223 5.25 '~13 ~ 05/22/02
224 5.25 28 05/22/02
Compressive Required
Stren.gth 28-Day
ps~ Strength
28-Day Average
40O0
NOTE: Sampled before pumping, per superintendent, Dusty.
TECHNICIAN:
DISTRIBUTION:
MFM (9:00am-10:30am)
(3) City of Coppell
(1) Vidaud & Associates
(1) Doyle Engineering Group
(1) Texas Unified Constructors, Inc.
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148