Amberpoint BP-LR020502REPORT OF DRILLED BELLED PIER OBSERVATION
Report Number: 94021029.0226
Service Date: April 19, 2002
Client: Transwestern Commemial Services
Attn: Jim Gaspard
5001 Spring Valley Rd. Suite 600W
Dallas TX 75244
8901 Carpenter Fm~j., Suite #100
Dallas, Texas 75247
(214) 630-1010
Report Date: May 02, 2002
Project: Amberpoint Building No. 1
Amberpoint Bus. Pk. @ Coppell
Coppell, Texas
Project Number: 94021029
Services:
Drilled belled pier observation.
On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled belled pier observation. See the attached sheet for recorded data.
Technician: Gerry Graham
Report Distribution:
(1) Transwestem Commemial Services
(1) O'Bden & Associates Inc
(1) TechniStructures Inc
(1) City of Coppell - Constr Insp
(1) City of Coppell - Bldg Insp
(1) Hill & Wilkinson Ltd
(1) Halff Associates
(1) State Farm Insurance
Reviewed by:
HBC Eng~
Eugene Harbour
Principal
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods, This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable
to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1 ~,,~,~,w