Loading...
Amberpoint BP-LR020501CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0237 Service Date: April 23, 2002 E. NGINFJ~ I)JNG 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestern Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: May 01,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 3000 psi (~ 28 Days Batch Time: 12:09pm Supplier: Potter Truck No: 102 Mix I.D. No.: 7752 Plant: 16 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature,° F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Ticket No: 613327 Sample Information Sample Time: 12:21 pm Date Cast:April 23, 2002 Technician: Gerry Graham Weather Conditions: Fair, partly cloudy Accumulative Yards: 360 Placement Method: Direct Discharge Sample Locations: Pier G.6/1 Placement Location: Piers Result Specification Test Method 5.50 5-7 ASTM C-143 N/A 84 ASTM C1064 80 ASTM C-1064 Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No. ID (inches) (sq. inches) Tested (days) (lbs) (psi) 1 1 6.00 28.27 04/30/2002 7 99,820 3,530 1 2 6.00 28.27 04/30/2002 7 98,710 3,490 Average 3,510 1 3 05/21/2002 28 I 4 05/21/2002 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Gerry Graham Report Distribution: (1) Transwestern Commercial Services (1) O'Brien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Constr Insp (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: HBC E~ Eugene Harbour Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 0, LLW'"D~ CONCRETE COMPRESSIVE STRENGTH TEST Report Number: 94021029.0173 Service Date: April 2, 2002 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 (214) 630-1010 Client: Transwestem Commercial Services Attn: Jim Gaspard 5001 Spring Valley Rd. Suite 600W Dallas TX 75244 Report Date: May 01,2002 Project: Amberpoint Building No. 1 Amberpoint Bus. Pk. @ Coppell Coppell, Texas Project Number: 94021029 Material Information Specified Strength: 3000 psi @ 28 Days Batch Time: 8:25am Plant: 16 Supplier: Potter Concrete Truck No: 113 Mix I.D. No.: 9337 Field Test Data Test Slump, inches: Air Content, %: Concrete Temperature, o F: Ambient Temperature, o F: Plastic Unit Weight, pcf: Laboratory Test Data Result 6.50 67 64 Ticket No: 612491 Sample Information Sample Time: 8:42am Date Cast: April 2, 2002 Technician: Gerry Graham Weather Conditions: Fair, cloudy Accumulative Yards: 10 Placement Method: Direct Discharge Sample Locations: D/7-G/7 = 4 Placement Location: Pier Specification Test Method 5-7 ASTM C-143 N/A ASTM C 1064 ASTM C-1064 Set Specimen Diameter Area Date No. ID . (inches) (sq. inches) Tested 1 1 6100 28.27 04/09/2002 1 2 6.00 28.27 04/09/2002 I 3 6.00 28.27 04/30/2002 1 4 6.00 28.27 04/30/2002 Age at Maximum Compressive Test Load Strength (days) (lbs) (psi) 7 126,140 4,460 7 122,060 4,320 Average 4,390 28 154,940 5,480 28 156,190 5,520 Average 5,500 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Technician: Gerry Graham Report Distribution: (1) Transwestem Commercial Services (1) O'Btien & Associates Inc (1) TechniStructures Inc (1) City of Coppell - Constr Insp (1) City of Coppell - Bldg Insp (1) Hill & Wilkinson Ltd (1) Halff Associates (1) State Farm Insurance Reviewed by: HBC Engi~ Eugene~"a~bour Principal The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wr'~en approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 °' LLW~01F~ur~KeY