Amberpoint BP-LR020422 (3)REPORT OF REINFORCING & POST TENSION STEEL OBSERVATION Date of Service: 04/22/02 Client No.: 3181 Client: Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Repo~ No.: 94021029.0240 Project No.: 940~n'~o ~ A Project: ~LMnberooint Buildin~ No. 1~.~ Am~oerpoint Bus. Pk. ~ Coppell Coppell, Texas Services: Observe placement of reinforcing for compliance with furnished drawings. Drawings Utilized: Locations/Items Observed: Test Method: PROJECT DATA Panels #23 to #37 Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Piecing Drawings Approved X Length and Shape X Column T~e spacing & Type Bar and Cable Size X Prof3e~ Placement X Stirrup spacing & Type Bar and Cable Grade X Propedy T~d X Rebar and Cables Clean X Dowel Bars in Place X Welded Splices Fo~n Clean X Proger Supports X Mechanical Splices N,~,har a B.~ .nd cab~s X ,~r cow X ~ s~s X Discrepancies/Comments: The following discrepancies were noted at the time of this observation. 1. Panel #31 was missing three (3) #5 (lifting steel) and Panel #24 was missing one (1) #5 (lifting steel). 2. Drainage sleeves were added to some panels. The buckets caused reinforcing steel not to have proper cover and reinforcing steel was touching the bucket. Field Results Report To: Technician: S. Campbell Reoort Distribution: (1) Transwcstem Commercial Service~ (1) O' Brien & Associates, Inc. (I) T¢chniStmctures, Inc. (1) City ofCoppell - Constr. Insp. Reinforcing steel will be reobserved prior to concrete placement. (1) City of Coppell - Bldg. lnsp. (1) Hill & Wilkinson, Ltd. (1) HalffAssociates (1) State Farm Insurance ~ Engineering, Inc. Eugene Harbour Principal REPORT OF REINFORCING STEEL OBSERVATION Date of Service: 04/22/02 Client No.: 3181 Client: Transwestem Commercial Services 5001 Spring Valley Rd, Suite 600 W Dallas, TX 75244 Report No.: 94021029.0239 Project No.: 94021029 Project: AmberpoLrtt Building No. 1 Ambe~point Bus. Pk. ~ Coppell Coppell, Texas Services: Drawings Utilized: Locations/Items Observed: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA PG S.2.2, dated 11/01/01 Slab, lines N to Q and 1.8 to 11 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column T~ Spacing & Type Bar Size I' X Propel Sar Placement X St"TUp Spacing & Type Bar Grade X Propady T~ed X Rebar Clean X Dowel Bars in Place X Ve~elded Splice~ Fern1 Clean ~X~ Propel Bar Supports X Mechanical Splices Numb~ of Bats X Prop~ Cover Lapped Spikes X Discrepancies/Comments: Any discrepancies found were corrected at the time of this observation unless otherwise noted. Field Results Report To: Technician: M. ATandia Reoort Distribution: (1) Transwestem Commercial Services (I) O' Bricn &Associatcs, Inc. (1) TcchniStmcmres, Inc. (1) City of Coppell - Constr. Insp. (1) City of Coppcll - Bldg. Insp. (1) Hill & Wilkinson, Ltd. (1) HalffAssociates (1) State Farm Insurance Engineering, Inc. Eugene Harbour Principal 309sk5 This report i? exclusively for the use of the client indicated above and sharl not be reproduced without written approval o~ HBC Engineering. Inc.