Loading...
Deforest Court-LR020430 (2)REPORT OF DRILLED PIER OBSERVATION Report Number: 94021129.0011 8901 Carpenter Fn~y., Suite #100 Service Date: April 19, 2002 Dallas, Texas 75247 Client: The Holmes Builders 7 s Projec Number: 94021129 Services: Drilled pier observation. On this date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for drilled pier observation. See the attached sheet(s) for recorded data. Technician: Phil Green H~ng Report Distribution: (1) The Holmes Builders Reviewed by: (1) City of Coppell - Constr Insp Husseir~ ~. Abusaad, P.E. (1) City of Coppell - BIdg Insp Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of Terracon. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1 r~ LLI W 0