Loading...
St Joseph-CN020506CENTEX CONSTRUCTION COMPANY, INC. P.O. Box 199117 3t00 McKinnon, 7th Floor Dallas, TX 752t9-9117 Dallas, TX 75201 214.468.4700 214.468.4275 (Fax) AMENDMENT NO. Amendment No. I This Contract Amendment is annexed to and expressly made a part of the Subcontract Agreement 217-ST JOE-022000-S dated 05103/02, by and between Centex Construction Company, Inc. ("Contractor") and Cooper Excavation, Inc. ("Subcontractor") for furnishing and installation complete of all Work described in the Subcontract Agreement for the Project known as St. Joseph Village, Coppell, Texas. 2. 3. 4. 5. 6. REVISIONS TO SCOPE OF WORK AND SPECIAL PROVISIONS Page 2 of 9, Article 3.B.1 - in paragraph (a), the second sentence, Delete the words "inlet protection", construction fencing", and "tree protection". Page 2 of 9, Article 3.B.1 - in paragraph (b), the second sentence, Delete the words "authorities as well" and add the words "General Contractor". Page 3 of 9, Article 3.B.3 - in paragraph (a), the first sentence, Delete the words "(pits, trenches, etc.)". Page 3 of 9, Article 3.B.3 - in paragraph (b), the first sentence, Delete the words "pits and walls until all backfill operations are completed". Page 3 of 9, Article 3.B.3 - in paragraph (c), Delete entire paragraph. Page 3 of 9, Article 3.B.4 - in paragraph (b), Delete entire paragraph. ALL OTHER TERMS AND CONDITIONS OF SUBCONTRACT AGREEMENT REMAIN UNCHANGED ACCEPTED: Cooper Excavatio By: Name: Title: Date: ACCEPTED: By: ~ntex Officer Name: Officer Title: Date: Construction Company, Inc. Amendment No. 217-ST JOE-022000-S Page 1 of 1 CENTEX CONSTRUCTION COMPANY, INC. Vendor No. Contract No. P.O. Box 199117 3100 McKinnon, 7th Floor SUBCONTRACT Dallas, Texas 752'19-9117 Dallas, Texas 75201 2'14-468.4700 214-468-4275(Fax) THIS AGREEMENT is entered into on April 19, 2002 by and between Centex Construction Company, inc. ("Contractor"), with its principal place of business at 3100 McKinnon, 7th Floor, Dallas, Texas 75201 and Cooper Excavation, Inc. ("Subcontractor"), with its principal place of business at · 1.1t27 Shady Trail, Suite 108, Dallas, Texas 75229; Phone: 972-243-5455; Fax: 972-243-5227. On May 1, 2002, Contractor entered into a pdme contract with St. Joseph, Inc., ('Owner"), whose address is t80 Samuel Blvd., Coppell, TX 75019 to perform the following work: St. Joseph Village Coppell, Texas SCOPE Subcontractor agrees to furnish all labor, services, materials, installation, hoisting, supplies, insurance, equipment, scaffolding, tcols and other facilities of every kind and description required for the prompt and efficient execution of 022000 - EARTHWORK, EXCAVATION AND GRADING work as further described herein in strict accordance with the Contract Documents. CONTRACT PRICE Contractor agrees to pay Subcontractor for the strict performance of its work the sum of: $743,020 (Seven Hundred Forty Three Thousand Twenty Dollars) subject to additions and deductions for changes in the work as may be agreed upon. SUBCONTRACTDOCUMENTS The "Subcontract Documents" include the Standard Form Subcontract, including Subcontract General Conditions pages 1 through 22; Subcontract Detailed Scope of Work and Special Provisions pages 1 through 9, the Bid Package and all other applicable Exhibits (Exhibit A - Contract Documents; Exhibit B - Payment Estimate Form; Exhibit C - Release; Exhibit D - Stored Matadal Checklist; Exhibit E - Not Used; Exhibit F - Sample Insurance Certificate; Exhibit G - Builder's Risk Deductibles and Limits of Liability; Exhibit H - EEO/Sexual Harassment Policy; Exhibit I - Contractor Safety Program; Exhibit J - Texas Sales and Use Tax Exemption Certification; Exhibit K - Project Rules and Regulations; and Exhibit L - Vendor Status Form). This Agreement constitutes the entire agreement between the parties hereto and supersedes all pdor negotiations, representations and agreements, either wdttsn or oral with respect to the subject matter hereof. No other agreements, either oral or written, have been made by Contractor, except as stated in this Agreement. This Agreement is being sent to Subcontractor for acceptance and signature but shall not be construed as constituting or creating a contract with Subcontractor until this Agreement is signed by Conbactor. Subcontractor shall sign this Agreement in the exact form submitted and return to Conlractor within ten days. If the above conditions are not met by Subcontractor, then this Agreement and Contracto¢s offer to contract hereunder may be canceled, unlsss Contractor,-in wdting, shall modify the conditions and/or extend the time'set forth herein. SUBCONTRACTOR shall not make any change to this Agreement without the prior written consent of Contractor's duly authorized officer or agent. Any change otherwise made shall be null and void. Cooper Excavation, Inc. Subcontractor By: Name: Title: (OwnerorOfficer) Subcontractor's Federal ID No. Da~: qS-ZqlSq s Centex Construction Company, Inc. Contra~ Bv/'~"~'/~:m~~. Gary J. Kei,, P .E. Title: Senior Vice President Contractor's Federa! ID No. Date: 752302166 RNPJrnr 217-ST JOE-022000-S CCC-6 (7/97) CENTEX CONSTRUCTION COMPANY, INC. P.O. Box 199117 3t00 McKinnon, 7th Floor 214-468-4700 Dallas, TX 75201 Dallas, TX 75219-9117 214-468-4275 (Fax) SUBCONTRACT SCOPE OF WORK AND SPECIAL PROVISIONS St. Joseph Village Cooper Excavation. Inc. 217-ST JOE-022000-S Coppell, Texas SCOPE OF WORK DEFINITION. CORRELATION AND INTENT: Subcontractor agrees to make the project complete in every respect insofar as this Subcontract is concerned in stdct accordance with EARTHWORK, EXCAVATION AND GRADING, the Contract Documents listed on Exhibit "A" and shop drawings and submittals as approved by the Architect and/or Owner, and the clarifications and assumptions as identified in Attachment No. 1, included herewith, dated Apd110, 2002. The Subcontractor shall not perform any portion of the work at any time without Contract Documents or, where required, approved Shop Drawings, Product Data, Manufacturer's Instructions or Samples for such portion of the work. The Subcontract includes but is not limited to providing of all submittals, shop drawings (and associated engineering), trade coordination, layout, hoisting, supervision, tools, equipment, scaffolding, supplies, incidentals, plant, labor, materials, services, cutting, cleaning, and any other work or systems required to perform the work as described below: SPECIFICATION REFERENCE: The organization of the spec~cations into divisions, sections and articles, and the arrangement of the drawings shall not control the Contractor in dividing the work among the Subcontractors or in establishing the extent of the Work to be performed by any Subcontractor. Reference is made to the following Divisions of Work and Specification Sections which relate to the Scope of Work, but is in no way intended to limit or alter the intent of the Contract Documents: SECTION NO. TITLE and DESCRIPTION DIVISION 00 DIVISION 01 DIVISION 02 SECTION 02230 SECTION 02240 SECTION 02260 SECTION 02300 INCLUSIONS: Geotechnical Engineering Report, complete; GENERAL REQUIREMENTS, complete; SITE WORK SITE CLEARING, complete DEWATERING, complete; EXCAVATION SUPPORT AND PROTECTION, complete; EARTHWORK, complete; It is Understood and agreed this Earthwork, Excavation and Grading Work includes all inclusions as described in the following subparagraphs regardless of whether or not they are in the above specifications or any other specification section or shown on the plans: Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc, 3.A. Desiqn Intent 1. It is the intent of the Scope of Work to convey to this Subcontractor the total responsibility for the EARTHWORK, EXCAVATION AND GRADING Work required for the ST. JOSEPH VILLAGE PROJECT. This Subcontractor understands that due to the Phased nature of this project, Construction Documents may not be 100 percent complete and will develop as the project progresses. However, the Subcontractor shall perform all work required or reasonably inferred under the best practices in the Construction Industry for a complete and fully functional and operational system(s) for the purpose intended. This project will require the Subcontractor to work as a team member with the Contractor and other members of the project team through the completion of construction to assure that all work required by this Scope will be performed in such a manner that it is complete, fully functional, and in accordance with the contract documents within the contract price. References to the term "Contractor'' in the Drawings and Specifications shall be interpreted to mean work by this Subcontractor as they relate to this scope of work. 3.B. Earthwork. Excavation and Gradlno,-Scooe of Work Soeclfic Inclusions The Subcontractor shall provide all Earthwork, Excavation and Grading work of this Subcontract in accordance with the Contract Documents, including, but not limited to the following: 1. Environmental Protection (a) Subcontractor shall be responsible for the installation, maintenance and removal of all environmental protection measures for the project in accordance with EPA's NPDES Regulation. This covers an erosion control plan that complies with EPA Notice of Intent, including, but not be limited to silt fencing, construction entrances, and truck cleanout areas. If additional measures should be required than those shown on sheet C9.0, they shall be the responsibility of the Subcontractor. (b) Subcontractor shall maintain the program at all times while on site and make all repairs to components as necessary at no additional cost. The Subcontractor shall do all monitoring and make all reports to the General Contractor. After demobilization by the Subcontractor, monitOring, maintenance and reporting shall be as established in the Unit Price Schedule of this Scope of Work. (c) Subcontractor shall be responsible for completing repairs to environmental protection work within 24 hours of notification by the General Contractor. (d) Subcontractor shall be responsible for street cleaning, dust control and noise control associated with the work of this Subcontract. Page 3 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. 2. Trench Safety Plan (a) Subcontractor shall have prepared for review a project specific Trench Safety Plan for all excavation work in excess of five feet deep. The plan shall be prepared, signed and sealed by a Civil Engineer, registered in the State of Texas, and shall address all components of Safety relative to all excavation, trenching and backfill operations to be done by the work of this Subcontract. No work shall commence until this plan has been submitted and approved by the Architect, Civil Consulting Engineer, or Owner. (b) Subcontractor shall assign a "competent" person to ensure that all work is completed in accordance with OSHA and the Trench Safety Act. This individual shall be on site at all times work is taking place. (c) Subcontractor shall be responsible for the protection and support of all existing utilities encountered during the work of this Subcontract and this coordination shall be addressed in the Trench Safety Plan to the extent possible. Dewatarina (a) Subcontractor shall be responsible for keeping all work areas associated with this Scope dry and free of standing water, including any dewatering, demucking or temporary grading to drain. (b) Subcontractor shall be responsible for rain and surface water removal from mass excavation. Demolition, Site Preoaration. Clearino and Grubbino (a) Subcontractor shall be responsible for the demolition and removal of ail objects such as concrete foundations, paving, curb and gutter, fencing, small structures, abandoned utility lines, and other items which are identified for removal on the select demolition or grading plans. Subcontractor shall provide for all sawcutting as necessar7 to perform work need and orderly. All capping of utilities shall be by others. (b) Subcontractor shall be responsible for all clearing and grubbing as indicated on the drawings or as specified. Subcontractor shall use all care and caution to remain within the confines of the identified project limits. (c) Subcontractor shall stdp site and provide stock pile sufficient quantities of topsoil for use with the final grading operation. All material shall be clean and free of rocks, roots and other debris (d) Subcontractor shall remove from site all debris and'unsuitable materials encountered during demolition and clearing and grubbing. Excavation, Backfillinq and Compaction (a) Subcontractor shall provide for all "mass, excavation for structures as indicated on the drawings and/or as further described herein. Subcontractor shall at all times while working on the project have competent supervision as required by OSHA and the Trench Safety Act. Subcontractor shall install, maintain and remove an access ramp into the excavation as indicated or where directed by the General Contractor. All excavation shall be cut back on proper slope and of sufficient width to allow for concrete formwork operations. (b) Subcontractor shall be responsible for all "over" excavation, both vertically and Page 4 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. horizontally and corrected at no additional cost to this Contract Amount. (d) Subcontractor shall be responsible for excavation for all classifications of materials encountered including all rock. (e) Subcontractor shall provide all machine fine grading. All grading shall be within a tolerance of +/- 0.10'. Gradina. Stabilization and TOD Soil (a) Subcontractor shall provide all rough grading of site as indicated on the Contract Drawings or as further described herein. Work shall be at elevations indicated or as may be directed by General Contractor to allow coordination of work by other trades such as the Landscape Subcontractor. (b) Subcontractor shall provide all subgrade building pads to a tolerance of +/- 0.10' taking into consideration all proof rolling operations and other conditions. (c) Subcontractor shall be responsible for all final or "blue top" grading of areas to receive paving and curb and gutter work to allow for paving thicknesses shown at elevations and grades indicated on contract drawings. (d) Subcontractor shall provide 6" Lime stabilization to the site paving under Star Leaf Road only, in accordance with the Construction Documents and Geotechnical Report. Subcontractor shall obtain lime delivery tickets and seals for the City of Coppell. (e) Subcontractor shall provide Moisture Conditioning of the soil at each of the 38 cottage pads. This consists of the removing 6'-0" of earth at each cottage pad, getting the soil to the desired moisture content, and replacing and compacting the soil in 1 '-0" lifts. Soil to be compacted to specifications listed in the HBC Soils Report. (0 Subcontractor shall provide 1 '-0" of select fill at each of the 38 cottage pads. Select fill shall be contained inside the building pad line, and native soil will be placed at all locations outside the building pad line. (g) Subcontractor shall collect, stockpile and respread ail topsoil in all site areas including lawns, planting areas and islands. (h) Subcontractor shall be responsible for all grading to ensure positive drainage in all locations on site, including the Phase II area. Any areas where "ponding" may occur, especially near structures, shall be brought to the attention of the General Contractor for evaluation with the Engineer/Architect. (i) Subcontractor shall ut~ize the spoils from the utility and foundation work for site grading. Subcontactor may also need to utilize a borrow pit for site grading. ~) Subcontractor includes backfill of existing ground storage water tank from existing tank floor level, to finish grades. It is understood that the existing tank floor and walls will remain to an elevation of +/- 1'-0" below existing grade. Partial demolition of existing tank by others (demolition subcontractor). (k) Subcontractor includes work associated with the construction of Star Leaf Road from it's intersection with Sandy Lake Road to it's connection with existing Star Leaf Road along the West property line across the new City property. (m) Subcontractor includes spreading of topsoil from stockpile immediately prior to installation of landscape irrigation subcontractor work which is phased and designated as Phase IA at Cottages and Phase lB at Main Building. 3.C. Related Requirements Page 5 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. The following related requirements apply to the work of this Subcontract whether provided by this Subcontractor, Tier Subcontractors or Others: 1. Subcontractor shall be responsible for street cleanup on a daily basis as a result of the work of this Subcontract. 2. Subcontractor shall be responsible for providing, installing, maintaining and removing excavation protection (such as barricades, fencing, flagging and warning signage necessary for safety and access around ail excavations that are a part of this Subcontract Scope of Work, until backfilled. 3. Subcontractor shall furnish all high impact lighting to safely allow night shift work to be undertaken. 4. Subcontractor shall be responsible for obtaining and payment for use of temporary water meters, IF required for the work of this Subcontract. 3.D. Coordination with Other Trades and Authorities This Subcontractor is responsible for coordinating with the other trades and authorities to ensure proper execution of the work and to ensure work is not delayed. Subcontractor shall provide all permits, impact fees, plan checks, licenses, inspections and associated fees (if necessary) to complete the work of this Subcontract, including any permits and fees for hauling and delivering of plant materials on all streets or roadways. Subcontractor shall cooperate fully with all building inspection officials with the review and inspection of the work of this Subcontract. Subcontractor shall promptly remedy all rejected or disapproved work by building inspection officials. Subcontractor shall cooperate fully with all testing laboratory and inspection personnel with the review and inspection of the work of this Subcontract. Subcontractor shall promptly address remedy's required for non-conforming work. Subcontractor shall be responsible for costs associated with failed tests, including rs-inspection and ratesting. Subcontractor shall be responsible for all traffic control including flag men and barricades as required for the execution of the work of this Subcontract. Subcontractor shall coordinate with the General Contractor all street closings and remuting of traffic and pedestrians required by the work. Subcontractor will receive, unload, store, and distribute all materials required by this Scope of Work. Coordinate delivery, storage and handling of all materials with the General Contractor's Superintendent or designated representative. Subcontractor shall be responsible for providing flag men during all hoisting operations for off loading and installation of materials and equipment. This Subcontractor is cautioned that storage space and areas are limited and any items stored in the building oron site must be approved by and coordinated with the General Contractor's Superintendent or designated representative. All other weatherproof storage of materials which is required by this Scope of Work is the responsibility of this Subcontractor. Subcontractor shall promptly prepare and provide the General Contractor with all warranties and guarantees as required by the Specifications OR as offered by the Product Manufacturers for all items which are a part of this Scope of Work. 7. Subcontractor shall promptly turnover all "attic" stock, spare parts and Page 6 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. 10. maintenance tools in storage containers as specified or directed and in locations as directed by the Owner or General Contractor. Subcontractor shall promptly prepare and turn over ail record and as-built drawings and surveys to document the work of this Subcontract. Subcontractor understands the necessity for proper site drainage especially at structures, and agrees to review all civil drawings for coordination with structural and other drawing disciplines for proper line and grade. Any discrepancies will be brought to the attention of the General Contractor for evaluation. Subcontractor shall inspect the entire site at least one week prior to beginning any work. The Subcontractor will become familiar with all existing underground utilities and ground conditions and advise the General Contractor of any deficiencies which need to be addressed and corrected. 11. 12. Subcontractor shall be responsible for procuring and executing any Tri-Party Agreements with, the Owner and City for any work outside property lines. Subcontractor shall cooperate fully with General Contractor and other key trades to ensure obtaining the Certificate of Occupancies in an expeditious manner. Field Enaineerinq (a) The General Contractor shall be responsible for all layout, engineering and grade staking, including horizontal and vertical control which is required to complete this Scope of Work. The General Contractor will provide: 1. One or more control Lines in each work area on site. 2. Bench marks for elevation control as necessary to complete work in each area of work on site. (b) This Subcontractor shall be responsible for the maintenance and protection of all control bench marks and lines established by the General Contractor. In the event that the control lines are destroyed, the General Contractor will re-establish the control lines a total of (2) times. Special Schedule Requirements 1. Subcontractor shall make multiple mobilizations as necessary to complete all earthwork, grading and backfill in phases as required by the Construction Schedule or as directed by the General Contractor. 4. EXCLUSIONS: Page 7 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. The Following Items are specifically excluded from the work of this Subcontract. A. Costs associated with testing laboratories, except for charges associated with "retesting" deficient work. (By Owner or by General Contractor) B. Perimeter or underslab subdrainage systems. (By Mechanical/Plumbing Subcontractor) C. Underground Utilities. (By Utility Subcontractor) D. Termite control. (By Termite Control Subcontractor) E. Cutting or capping of utilities. (By Applicable Utility Subcontractors) F. Supporting, bracing or relocafion of any utility systems. (By Utility Subcontractors) G. Furnishing or installation of gravel, sand fill or underslab vapor barriers. (By Concrete Subcontractor) UNIT PRICES: Centex Construction reserves the right to modify the work in accordance with the following Unit Prices at the costs as noted. Unit Prices ara good throughout the duration of the project and include all burdens, overhead markups, and profit. Subcontractor shall replace Silt Fencing destroyed or damaged by other trades at a cost of $2.00/LF. 6. ALTERNATES OR OPTIONS: "NOT USED" RECAP OF CONTRACT AMOUNT: The Total Subcontract Amount is arrived at and recorded as follow.~: Original Bid Amount Add for 6' Lime Stabilization Add for Dirt Fill in Existing Water Tank Add for the Respreading of Topsoil TOTAL SUBCONTRACT AMOUNT $666,660 $ 24,90O $ 22,400 $ 29.060 $743,020 For accounting purposes, the following breakouts are included in the above Raising of grade at the old City Tank Site $107,172 Grading for the City portion of Star Leaf Rd. $ 23,816 Page 8 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. SPECIAL PROVISIONS The following Special Provisions modify, delete and/or add to the Subcontract General Conditions. Where any paragraph or subparagraph in the Subcontract General Conditions is supplemented by one of the following paragraphs, the provisions of such paragraph or subparagraph shall remain in effect and the Special Provisions shall be considered as added thereto. When any paragraph or subparagraph in the Subcontract General Conditions is amended, voided, or superseded by any of the following paragraphs, the provisions of such article, paragraph, or subparagraph not so amended, voided, or superseded shall remain in effect. 7. 8. 9, 10. SURETY TERMS. Subcontractor will be enrolled in an Alternate Surety Program "Subguard" for this project. SALES TAX. [Reference General Conditions Paragraph 2.1.] Refer to Texas Sales and Use Tax Exemption Certification, Exhibit "J", for your use. Cost of applicable tax is excluded from the Contract Price. PAYMENTS TO SUBCONTRACTOR. [Reference General Conditions Paragraph 4 in its entirety] RETENTION. [Reference General Conditions Paragraph 4.C] INSURANCE. [Reference General Conditions Paragraph 6 in its entirety] As to the Liability policies, the Certificates of Insurance and policies shall name Centex Construction Company, inc., ST JOSEPH VILLAGE, INC., A Non Profit Corporation (Owner); AGUIRRE CORPORATION, (Amhitect) as Additional Insureds on Form No. CG 20 10 11 85 (Form B) or its equivalent. INDEMNIFICATION. [Reference General Conditions Paragraph 7 in its entirety] MBF-/WBE REQUIREMENTS [Reference General Conditions Paragraph t4.J. in its entirety] HOISTING. [Reference General Conditions Paragraph 2.C(7)] CONTRACTOR SERVICES. [Reference General Conditions Paragraph 2.C.(1); 2.C.(2); 2.C.(5); and 2.C.(8); and 2.C.(t0)] SITE UTILIZATION AND ACCESSIBILITY. [Reference General Conditions Paragraphs 2.C.(3); 2.C.(6); 2.C.(9); and 2.C.(11)] Page 9 Subcontract Detailed Scope of Work & Special Provisions Centex Construction Company, Inc. Il. SUBMITTALS. It is understood that construction time for this project is extremely critical. Subcontractor, therefore, agrees to provide, within Seven (7) days after the award of this Subcontract, a complete listing of all required submittals and their anticipated submittal dates. This schedule must comply with the dates indicated in paragraphs A., B. and C, below. All submittals must be in strict accordance with the specific requirements of applicable Specification Sections. A. Begin submittal of shop drawings, certificates, and test reports upon receipt of Notice to Proceed. B. Complete submittal of shop drawings, certificates, and test reports within 10 days of Notice to Proceed. 12. '13. 14. C. Resubmit any items within a maximum of Seven (7) calendar days after being returned for correction, D. Furnish from suppliers, written evidence of confirmed shipping dates for major materials and equipment. CONSTRUCTION DOCUMENTS. Contractor will provide Subcontractor with one complete set of the Construction Documents at no cost. Any additional sets required will be at Subcontractor's expense. CITY OF C0PPELL ORDINANCES. Subcontractor shall comply with all local codes, ordinances, rules, and regulations, and specifically those associated with excessive noise. CONTINGENCY CLAUSE. Subcontractor understands that this Subcontract is contingent upon the signing of the Owner and Contractor Contract. If an agreement is not reached, there will be no obligation on the part of either party to this Subcontract, END OF SCOPE OF WORK AND SPECIAL PROVISIONS Page 10 Scope of Work & Special Provisions ATTACHMENT No. 1 Subcontract No. 217-St. Joe - 022000-S St, Joseph Retirement Village PROJECT Clarifications and Assumptions (Revised April 10,2002) Division 2 - Sitework · Selective demolition covers drainage ditch bank protection and removal of one drainage culvert and wing walls. · Cottage slabs-on-grade - One (1) foot of select fill will be placed over a moisture-conditioned sub base. Moisture-conditioning occurs to a depth of 6' below the slab. The final subgrade is proof-rolled and scarified and recompacted. (No drilled caissons or carton forms). · Two (2) inches of sand over vapor barrier over 5 inches granular base included under all slabs on grade. · Subsoil termite treatment beneath building footprints is included. · permanent dewatering of site and buildings is excluded. · GMP'does not include any sodding. · StarleafRoad is 8" 3000 psi concrete reinforced with #3 @ 18"ocew. · Star Leaf Road receives lime stabilization at 6% 6" deep. Other pavements do not receive lime stabilization. · Fire lane pavements are installed at a thickness of 7" and concrete strength is 4,000 psi. · Driveways and other pavements are 5" in lieu of 6" and concrete strength is 3000 psi with #3 reinforcing @ 18"ocew. Driveways and other pavements do not receive any moisture conditioning belo~ Pavement. · Pavements are sloped in one direction to eliminate 20 inlets and 452 linear feet of reinforced concrete pipe. · All sidewalks are 4" concrete 3000 psi in strength reinforced with #3 ~ 18"ocew. · All streets have 6" x 6" monolithic curbs. · Striping for parking and fire lane is included. · Wheel stops are excluded. · Brick pavers are excluded but stamped concrete is included at the bridge and main entrance as shown. Pattern shall be of standard design. · Two site entrance signs are included as shown. Metal with painted finish. · GMP includes the vertical walls and bollards at the bridge as shown on Al.4. · Joint sealant for expansion and control joints is included. Page 1 Scope of Work & Special Provisions ATTACHMENT No. 1 Subcontract No. 217-St. Joe - 022000-S St. Joseph Retirement Village PROJECT Clarifications and Assumptions (Revised April 10,2002) Division 2 - Sitework (Cont'd) · Asphalt is included at the Sandy Lake Road entrance and StarleafRoad North end where the elevations will not meet until sandy lake Road is elevated. · Perimeter fence will be brick and stone with brick columns as shown on drawing L1.3 ending at Phase I with a wood fence along the South. · GMP includes electric swinging ornamental entrance gates and pedestri~,n gates with keypad and telephone access to main lobby and 238 (ea.) remote openers. Embedded exit loop is included. · GMP does not include guardhouse, statue or fountain. · Gazebos (2 ea.) are 12' diameter Victorian model manufactured by Vixen Hill. · Four (4) covered parking canopies are included. They are constructed of steel and wood trusses with composition roofing. They are painted inside and exposed. They are hghted. · GMP includes a stone/steel fence as detailed in fi:ont of the covered parking spaces. A 5' sidewalk between the fence and parking is included. Storage units are excluded (FFE). · Site statue is not provided. · Site lighting is included. · Phase II paving work on the loop road and cul-de-sac is not included. · The GMP does not include a retaining wall on the west side of the site. In lieu of the retaining wall, the GMP includes a sloped concrete sidewalk with a 2' to 3' block keystone wall for a total of 335 lineal feet. Page 2