Loading...
TR8901-AG 8908084-24-89 AGENDA REQUEST FORM CITY COUNCIL MEETING Auqust 8~ 1989 ITEM NO. ITEM CAPTION: Discussion, consideration and awarding of a contract to Arjang Electrical System-~, Inc. in the amount of $146,387.00, for the Denton Tap Road traffic signals at Bethel School Road and Parkway Boulevard; and Sandy Lake Road traffic signal modifications at Moore Road. STAFF R. EP. :Russell R. Doyle, P.E.,  (Director'~'S~'ture) City Engin~r O~ER R~. :Gi~, Inc. ~roj~t ~g~eer ~ALUATION OF IT~: DATE: Jul~ 31, 1989 Pl~se refer to the Jul~ 28, 1989, Ginn, Inc. ~ck~d ~]~r~ ~d rec~tion. STAFF ~C~NDS AW~ ~ ~G FOR $1'46,387.00 TO INC~E ~RNA~ NO. 2. Per ~e at~ch~ m~ b~ ~e Fin~ce De~r~t, ~e f~d~g is avail~le. ~e s~tted bids p~vide a better operational level of se~ice, ~d ~e ~uipm~t (traffic li~t h~ds ~d controllers) c~ be us~ on future up~ades {i.e. ~p~v~t of S~d~ ~e Road to a six l~e divided ~oroughfare). ~ stat~ in ~e at~ched letters betwe~ G~, Inc., ~d ~e P~lic Works ~r~t, (dat~ J~e 21, 1989 ~d J~e 26, 1989 resp~tivel~), ~e multi sonics 820 A ~ipm~t will provide more cost eff~tive operation, ~t~ce ~d flex~ilit~. ~lic Works De~r~t Personnel c~ ~swer further ~estions at ~is Cit~ Co~cil meet~g. BI, GET AMT.: COF/~ENTS: ~146.~87.00 AMT. +/- BUDGET: AMT. ESTIMATED: $746; ~R7 on FINANCIAL REVIEW BY: LEGAL REVIEW BY: AGE5~DA REO FORM.O5$SDS August 1, 1989 Memorandum To: From: Subject: Alan D. Ratliff, City Manager Frank Trando, Deputy City Manager/Finance DirectorC~ Awarding Bid for Signalization It is my understanding that this contract would be for three (3) signals; one at Denton Tap and Parkway Boulevard, one at Bethel School Road and Denton Tap. There has been $170,000.00 budgeted in the Denton Tap Road Improvement Budget for signalization. The cost for those two signals would be $129,792.00, therefore, there will be a savings of $40,208.00. The third signal is for the Sandy Lake/Moore Road intersection. In the 1984 Bond Issue there was $75,000.00 issued for a traffic signal at that intersection. It appears that if the Council approves alternate two this will be accomplished for a sum of $16,595.00. We would therefore realize a savings on that issue of $58,405.00. As indicated on the agenda request form, the total awarding of the contract will be for $146,387.00. Should you have any questions or comments please don't hesitate to contact me. FT/lr SIGNLBID.002