Loading...
ST9302-CS020509From: To: Date: Subject: "Tom" <tom.woliver@tbg-inc.com> "John Elias" <jelias@ci.coppell.tx.us> 5/9/02 11:44AM Sandy Lake Update John, Just a quick update on the progress for Sandy Lake Road Landscaping. We have now received enough base information from Kimley Horn and Eddie to begin design concepts. We anticipate to review design options with you by the end of the month. However, we still need more site / base information if we are to take any concepts to a construction document format. The remaining items needed are as follows: 1. All irrigation taps and sleeves from Macarthur to Denton Tap. 2. Existing locations of light pole fixtures 3. Actual field locations of existing sidewalks. We need to get the above items by the end of the month if we are to keep track with a reasonable schedule. Let me know if we can achieve this milestone by the end of the month. Thanks, Thomas W. Woliver, ASLA Senior Associate TBG Partners 302 North Market St. Suite 450 Dallas, Tx 75202 214.744.0757 ph 214.744.6785 fx CC: "Mark Meyer" <mark.meyer@tbg-inc.com>, "Jim Manskey" <jim manskey@tbg- nc.corn>