Loading...
CF-Coppell Rd SC-LR020426Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Texas Unified Constructors, Inc. DATE: PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: LOCATION OF POUR SET I: Light pole piers #1 thru//10 and sign piers LOCATION OF POUR SET 2: 01.1054 26 April 2002 Lattimore SAMPLE DATA: SET 1 SET 2 MIX NO. 65 Truck No. 1109 Cement Ticket No. 6173898 Flyash Time Batched 8:26am Sand Time Sampled 9:01 am in. Concrete Temp. {ASTM C1064) 70OF 1.0 in. Air Content (ASTM C231~ 8.8% Water Unit Weight (ASTM C138) Admix//1 Admix//2 AEA COMPRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch c_y_~der) Cylinder Slump Age Test Number Inches Days Date (ASTM C 143) Total Load Compressive Required Pounds Strength 28-Day psi Strength 225 6.25 7 05/03/02 226 6.25 28 05/24/02 227 6.25 28 05/24/02 *4000 psi used. 75,400 2670 28-Day Average 3500* TECHNICIAN: DISTRIBUTION: CBC (8:30arn-10:30am) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148