ST9905-CS020208STATUS REPORT Date: February 8, 2002 To: Ken Griffin. P.E. Teresa Turner Susan Taylor City of Coppell - Director of Engineering City of Coppell - Graduate Engineer City of Coppell - CIP Coordinator From: Craig Bond, P.E. TranSystems - Project Engineer CC: Paul Padilla, P.E. Joe Masterson, P.E. Mike Hobbs Transystems - Project Coordinator TranSystems - Project Manager TranSystems - Project Hydrologist Re: Bethel Road Project (Dallas/Tarrant County Line to Freeport Road) Coppell, Texas Utilities Preparing letter to send out to utility companies requesting their utility relocation design based on the 60% plan set. Roadway Design · Submitted 60% plan set to City on 1-18-02 Made edits to 60% plan set based on redline comments from City on 11-19-01 plan set submitted to utilities. · Finishing up construction estimate. Will submit to City next week. Hydrology/Hydraulics · Draft Hydrology & Hydraulics Report submitted to City at 1-18-02 meeting. · Detention pond options submitted to City for review the week ending 1-25-02. For Discussion At Next Meeting With City · City's commems on Draft Hydraulics & Hydrology Report and detention pond options. · Meeting with DFW Airport to discuss detention ponds and construction & slope easements.