Loading...
ST9801-CS020211FNI DALLAS FREESE * NICHOLS MEMORANDUM TO: FROM: SUBJECT: DATE: Larry Davis Scott Maughn Coppell Rd Pay Estimate Q~ssntities February 11, 2002 As per your reque, st, I~.I.~lll]~ed the quantifies of Item .. ,~17" Reinforced Concrete Hike and Bike) and Item l~llll[l~lReinforced Concrvte Sidewalk) on Pay Estimate 15 with the CAD files office con~/~uction plans. I found that the quanti~ of Item N~mparison to the drawings. As for the quantity of Item ~I estimated that the area of 4" reinforced concrete sidewalk for the project was appr,oxlmatel~[[~[t~ y,ards, which is significantly lcss than the 1405.62 square yards Ed Bell Construction~'~o. has in their Pay Estimate 15. This discrepancy is an approximate difference If a field verification is necessary, please let me know so I can make arrangements to be at thc project location. Also, please keep mc informed of this situation, and feel free to contact me for any assistance or other verification. TOTAL P.02