ST9801-CS020211FNI
DALLAS
FREESE * NICHOLS
MEMORANDUM
TO:
FROM:
SUBJECT:
DATE:
Larry Davis
Scott Maughn
Coppell Rd Pay Estimate Q~ssntities
February 11, 2002
As per your reque, st, I~.I.~lll]~ed the quantifies of Item .. ,~17" Reinforced Concrete Hike and
Bike) and Item l~llll[l~lReinforced Concrvte Sidewalk) on Pay Estimate 15 with the CAD
files office con~/~uction plans. I found that the quanti~ of Item N~mparison
to the drawings. As for the quantity of Item ~I estimated that the
area of 4" reinforced concrete sidewalk for the project was appr,oxlmatel~[[~[t~ y,ards,
which is significantly lcss than the 1405.62 square yards Ed Bell Construction~'~o. has in their
Pay Estimate 15. This discrepancy is an approximate difference
If a field verification is necessary, please let me know so I can make arrangements to be at thc
project location. Also, please keep mc informed of this situation, and feel free to contact me for
any assistance or other verification.
TOTAL P.02