Loading...
ST0001-CS020506May 6, 2002 Mr. Chris Sclmitger Schrickel, Rollins & Associates 1161 Corporate Drive, Suite 200 Arlington, Texas 76006 RE: Creekview Drive and Freeport Parkway Project ST 00-01 Sidewalk Review Comments Dear Mr. Schnitger: Following a review of the above referenced plans, the following comments are offered for your consideration: SHEET NO. 1 1. The sidewalk must meet all ADA requirements. 2. Show a bold line at the beginning and end of the sidewalk that is not part of this contract and make the crosshatching bolder. Change "End Sidewalk" to "End Sidewalk This Contract". SHEET NO. 2 1. How will the proposed sidewalk adjacent to the proposed Tennis Center align with the new drive? 2. Change "End Sidewalk" to "End Sidewalk This Contract" and "Begin Sidewalk" to ''Begin Sidewalk This Contract". Show a bol.cl line at the beginning and end of the sidewalk that is in the area of the existing stockpile and make the crosshatching bolder. 3. Show a cross-section of the sidewalk next to berm and the back-of-curb. 4. It appears that the berm is going to be graded. The grading, irrigation, and landscaping are not in this construction contract. 255 PARKWAY "A'P.O.BOX 478 ~r COPP£LL. TX 75019 11~TEL 972/462 0022 ~i' FAX 972/504 5673 Show a cross-section of the sidewalk next to the berm and the back-of-curb. It appears that the berm is going to be graded. The grading, irrigation, and landscaping are not is t~his con. action coah-act. Please revise the plan sheets as needed. Should you have any questions or nc-al any additional information, please contaot me at 972-304-7019, Sincerely, Taylor C.I.P. Coordinator Enclosures