Loading...
ST0001-LR020515RoneEn gine ers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF PULVERIZATION/GRADATION TESTING Client: Infrastructure Services, Inc. Arm: Mr. Phillip Bennett PO Box 496448 Garland TX 75049-6448 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Pulverization/Gradation Testing Report of Test Report No.: 147290 Project No.: 026186 Date of Service: 04/06/2002 Report Date: 05/15/2002 On this date, a Rone Engineers, Inc. representative was on site to perform Pulverization/Gradation Testing. The results are attached. Technician Time: lt:15am - 12:15pm Page I of 2. ***REVISED this date to Technician: Chris Webber Report Distribution: (I) [nfrasUucmre Scrviccs, Inc. (1) City of Coppell (1) City of Coppell (!) City of Coppell reflect correct client*** (1) Infrastructure Services, Inc. (I) Schrickcl, Rollins & Assoc., Inc. Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibi!it~ for variation in quality (composition, appeasancc, performance, etc.) or any other fcaturc of similar subject matter provided by persons or conditions ovcr which we have no conuol. Our letters and repons are for the cxclnsivc usc of the clients to whom they are addresscd and shall not be reproduccd cxcept in full without the written approval of Rons Engineers, Inc. ' 99DK Page I of I RoneEngineers Client: Infrasl~ucture Services, Inc. At, n: Mr. Phillip BennetX PO Box 496448 Garland TX 75049-6448 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Cylinder Collection 8908 Ambassador Row Dallas, Texas 75247-4510 (214} 63~-974S (214) 630-9819 (fax} REPORT OF CYLINDER COLLECTION Report No.: 148138 Project No.: 026186 Date of Service: 04/20/2002 Report Date: 05/15/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: 7:00 a.m. - 9:00 a.m. Page 1 of 1 ***REVISED this date to reflect correct client*** Technician: Anthony Maldonado Report Distribution: (1) Infrastructure Services, Inc. (1) City of Coppell (I) City of Coppell (1) City of Coppell (I) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Cla~tark Project Manager LIMITATIONS: Thc test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other fi~ature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports nrc for thc exclusive usc of the clients to whom thcy~arc addressed and shall not bc reproduced except in full without thc written approval of Ronc Engineers, Inc. 99DF Page I of I ineers Client: Infrastructure Services, [nc'. Arm: Mr. Phillip Bennett PO Box 496448 Garland TX 75049-6448 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Cylinder Collection 8908 Ambassador Row Dallas, Texas 75247-4510 (214] 6~0-9745 (214) 630-9819 {fax) REPORT OF CYLINDER COLLECTION Report No.: 148698 Project No.: 026186 Date of Service: 04/27/2002 Report Date: 05/15/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior ~o this date. Technician Time: 7:30am - 9:30am Page 1 of 1 ***REVISED this date to reflect correct clent*** Technician: Eric White Report Distribution: (I) Infrastructure Services, Inc. (I) City of Copl~ll (1) City of Copp~ll (1) City of Copp~ll (1) Infrastructure Services, lac, (1) Schrickcl, Rollins & Assoc., Inc. Project Manager LIMITATIONS: Thc test results presented herein were prepared basad upon thc specific samples provided for t~ting. Wc assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repo~s are for thc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without thc written approval of Rone Engineers, Inc. 99DK Page 1 of 1 Ro gineers Client: lnfrestructure Services, Inc. Attn: Mr. Phillip Bennett PO Box 496448 Garland TX 75049-6448 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Cylinder Collection 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax} REPORT OF CYLINDER COLLECTION Report No.: 147306 Project No.: 026186 Date of Service: 04/06/2002 Report Dnte: 05/I 5/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page 1 of 1 8:00 am to 10:00 am ***REVISED this date to reflect correct client*** Technician: Cody Carroll Report Distribution: (1) Infrastructure Services, Inc. (1) City of Coppell (1) City of Coppell (l) City of Coppoll (1) Infrastructure Services, Inc. (1) Schrickel, Rollins & Assoc., Inc. Ro . LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hevc no control. Out lencrs and reports arc for thc exclusive usc of thc clients to whom they arc addressed and shall not he reproduced except in full without thc written approval of Rone Engineen, Inc. 99CM Page 1 of I Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 63O-9745 (214) 6~0-9819 {fax} CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 147230 Project No.: 015729 Date of Service: 04/05/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concret~ at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR {%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRET~ SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 eLACEMENT DATE: 04/05/2002 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 10:20am BATCH TIME: 9:18am TEMPERATURE (F) - AIR 60 F CONCRETE: 70 g TRVCK NO: 1124 TICm~T NO: 3142726 AIR CONTENT (%): NA UNIT WEIGHT {pet): NA OVERALL PLACEMENT LOCATION: Paving - Freeport from Station 31 +50 to Station 36+.03 SAMPLE LOCATION: Station 32+50 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" {area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.75 04/09/2002 ~ 90530 ~ Unbonded Cap 1 2 3.75 04/12/2002 ~ 99750 ~ Unbonded Cap I 3 3.75 05/03/2002 127440 Unbonded Cap 1 4 3.75 05/03/2002 128930 Unbonded Cap Average 4540 1 5 Hold LIMITATIONS: Thc test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other fi=arum of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of RoDe Engineers, Inc. 01DK Page I of 6 Report No.: 147230 RoneEngineers Project No.: 015729 Client: City of Coppell ~li/ CYLINDER MEASURED MARKED SLUMP SET NO. (inches) DATE AG E TESTEI} (days) MAXIMUM COMPRESSWE LOAD STRENGTH FRACTURE (lbs. force) (psi) TYPE ***REVISED this date overtime*** to reflect correct billing time. See report ~149797 for LIMITATIONS: Thc test results presented her~in were p~pared based upon the specific samples provided for t~sting. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lctmrs and reports are for the exclusive us~ of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rons Engineers, lnc. 01DK Page 2 of 6 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 63O-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Ci~' of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 147230 Project No.: 015729 Date of Service: 04/05/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppcll, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA ~TRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRET~ SUPPLIER: l~attimore PLANT: 3 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/05/2002 WEATHER CONDITIONS: Sunny TIME SAMPLED: 12:30pm BATC,HTIME: ll:39am TEMPERATURE (F} - AIR 62 F CONCRETE: 78 F TRUCK NO: 1026 TICKET NO: 7115227 AIR CONTENT (%): 4.8 UNIT WEIGHT (pet}: NA OVERALL PLACEMENT LOCATION: Paving - Freeport from Station 31 +50 to Station 36+.03 SAMPLE LOCATION: Station 33+66 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 3.25 04/09/2002 4 105690 3740 Unbonded Cap 2 2 3.25 04/12/2002 7 i 14350 4040 Unbonded Cap 2 3 3.25 05/03/2002 28 148745 5260 Unbonded Cap 2 4 3.25 05/03/2002 28 152600 5400 Unbonded Cap Average 5330 2 5 Hold LIMITATIONS: Thc tcst results presented herein were prepared bascd upon the specific samples provided for testing. Wc assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which wc have no control. Our letters and repoC~s ate for the exclusive use of the clients to whom they ate addressed and shall not be reproduced except in full without the written approval of Rone £ngincers~ lac. 01DK Page 3 of 6 Report No.: 147230 RoneEngineers Project No.: 015729 Client: City of Coppell mm~mJl CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (wi) TYPE LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, pcrformance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are add~ssed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 4 of 6 Ro gineers 8908 Ambassador Row Dallas. Texas 75247-4510 (214) 630-9745 (214) 630.9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 147230 Project No.: 015729 Date of Service: 04/05/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of frash concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR {%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCR~['~ SUPPLIER: Lattimore PLANT: 3 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3% - 5% ASTM C- 172 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/05/2002 WEATHER CONDITIONS: Sunny TIME SAMPLED: 3' I Opm BATCH TIME: 2:01 pm TEMPERATURE (F) - AIR 65 F CONCRETE: 80 F TRUCK NO: 956 TICKET NO: 7115240 AIR CONTENT (%): 4.2 UNIT WEIGHT (pcO: NA OVERALL PLACEMENT LOCATION: Paving - Freeport from Station 3 I+~0 to Station 36+.03 SAMPLE LOCATION: Station 36+.03 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AG E LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 3 I 4.5 04/09/2002 4 80990 2860 Unbonded Cap 3 2 4.5 04/12/2002 7 97390 3440 Unbonded Cap 3 3 4.5 05/03/2002 28 124795 4410 Unbonded Cap 3 4 4.5 05/03/2002 28 122540 4330 Unbonded Cap Average 4370 3 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fuji without the written approval of Rone Engineers, ]nc. 01DK Page $ of 6 Report No.: 147230 RongEilgjneer~ Project No.: 015729 Client: City of Coppell ~J/ CYLINDER MARKED SET NO. MEASURED SLUMP (inches) DATE AGE TESTED (deys) MAXIMUM LOAD (lbs. force) COMPRESSIVE STRENGTH (psi) FRACTURE TYPE Technician: Cody Carroll Report Distribution: (I) City of Coppell (!) City of Coppcll (1) City of Coppell (I) Infrastructure Services, Inc. Started: 7:00am Finished: 3:00pm (1) City of Coppell (1) Schricbel, Rollins & Assoc., lnc Rone E~e~ Project Maria LIMITATIONS: The test result~ presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the writmn approval of Rone Engineers. lac. 01DK Page 6 of 6 Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9'745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148410 Project No.: 015729 Date of Service: 04/24/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field ~sting, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/24/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 9:00am BATCH TIME: 8:26am TEMPERATURE (F} - Alii 75 F CONCRETE: 90 F TRucK NO: 1125 TICKET NO: 7115787 AIR CONTENT {%): 4.0 UNIT WEIGHT (pPI): NA OVERALL PLACEMENT LOCATION: Paving - turn lan~ of Freeport Parkway to Ruby, eastbound approaches on Stat~ and southbound and northbound driveway leading into wast parking lot, and apex of median of State & Freeport notch & south SAMPLE LOCATION: 5' south x 3' east of northwest REPORT OF TESTS com of approach at Freeport Concrete Compressive Cylinder 6" x 12" (area 28.27 SCl. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 3.0 04/27/2002 3 75455 2670 Unbonded Cap 1 2 3.0 05/01/2002 7 92375 3270 Unbonded Cap 1 3 3.0 05/22/2002 28 Unbondcd Cap 1 4 ' 3.0 05/22/2002 28 Unbonded Cap I 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Om' letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. O1DK Page 1 of 3 Report No.: 148410 RoneEmlineers Project No.: 015729 Client: City of Coppell ~i~l Water added au site: 10 gallons ***REVISED this date to reflect correct billing time. See report #149798 for overtime*** LIMITATIONS: Thc test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports ate for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 3 Ro gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 {214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148410 Project No.: 015729 Date of Service: 04/24/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppoll, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and t~sting in accordance with applicable standards. PROJECT DATA STRENGTH: sLuMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 6% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- ! 064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/24/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: l:05pm BATCHTIME: 12:36pm TEMPERATURE {F) - AIR 78 F CONCRETE: 90 F TRUCKNO: 975 TICKETNO: 3143682 AIR CONTENT (%): 4.5 UNIT WEIGHT (pct}: NA OVERALL PLACEMENT LOCATION: Paving - turn lane of Frceport Parkway to Ruby eastbound appmachments on State and southbound and northbound driveway leading into west parking lot and noses of methun State & Freaport north & south SAMPLE LOCATION: 10' north x 8' east of southwest REPORT OF TESTS comer of driveway west parking lot Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 2 1 3.25 DATE TESTED MAXIMUM COMPRESSIVE AG E LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 04/27/2002 3 80130 2830 Unbonded Cap 2 2 3.25 05/01/2002 7 89780 3170 Unbonded Cap 2 3 3.25 2 4 3.25 05/22/2002 05/22/2002 28 Unbonded Cap 28 Unbonded Cap 2 5 Technician: Anthony Maldonado Report Distribution: (1) City of Coppell (l) City of Coppell (1) City of Coppell (1) Infrnstmcture Services, Inc. Hold Stnrted: 7:30am Finished: 3:30pm (1} City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Stark Project Manager LIMITATIONS: Thc test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 3 of 3