Loading...
ST0001-LR020423 (2) gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-~745 (214) 630-9819 (fax) CONCRF TE COMPRF SSIVE STRENGTH TEST Client: - Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 147712 Project No.: 015729 Date of Service: 04/15/2002 Report Date: 04/23/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at thc placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPZC~CA~ON REQUiREMENtS 3000 psi ~ 28 Days 3" 7 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C-138 ASTM C-39 ' MIX DESIGN LD.: 42 PLACEMENT DATE: 04/15/2002 WEATHER CONDITIONS: C[oudy TIME SAMPLED: 9:50am BATCH TIME: NA TEMPERATURE (F}- AIR 78 F CONCRETE: 89 F TRUCK NO: 1042 TICKET NO: 7115436 AIR CONTENT (%): 4.0 UNIT WEIGHT (poi): NA OVERALL PLACEMENT LOCATION: Paving - intersection of Ruby and Freeport SAMPLE LOCATION: 20' north x 5' west of southeast REPORT OF TESTS co=er of paving Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYL1NDER MEASURED MARKED SLUMP DATE AGE SET NO. (inches) TESTED (days) I 1 4.5 04/18/2002 3 1 2 4.5 04/22/2002 7 1 3 4.5 05/13/2002 28 1 4 4.5 05/13/2002 28 1 5 Hold MAXIMUM COMPRESSIVE LO.M} STRENGTH FRACTURE (lbs. force) (psi) TYPE 93170 3290 Unbonded Cap 112980 4000 Unbonded C~p Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided fur testing. We assume no responsibility for variation in quality (composition, appearance, pcrtbrmance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page I of 4 Report No.: 147712 RoneEngineers Project No.: 015729 Client: City of Coppcll Water added at site: 10 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibiliv/for variation in quality (composition, appearance, performance, etc.) or any other feature of almilar subject matter provided by persons or conditions over which we have no conu'ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 2 of 4 gineers sgog Amhas,ador Row Dallas, Texas 75241-4510 (214) 630-9745 (214} 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell ARm Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75109 Report No.: 147712 Project No.: 015729 Date of Service: 04/15/2002 Report Dnte: 04/23/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA' STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECiFiCATION REQUIREMENTS 3000 psi ~ 28 Days 3"- 5" 3% - 5% ASTM C- 172 ASTM C-31 ASTM C- 143 ASTM C-231 ASTM C-I064 ASTM C-138 ASTM C-39 · MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/15/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 12:00pm BATCH TIME: NA TEMPERATURE (F)-AIR 80 F CONCRETE: 90 F TRUCK NO: I 125 TICKET NO: 7115448. AIR CONTENT (%): 4.5 UNIT WEIGHT (pe0: NA OVERALL PLACEMENT LOCATION: Paving - turn lane of Freeport, southbound, turning east SAMPLE LOCATION: Please see below REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (ar~a 28.27 sq. in.) CYLINDER MEASURED MAXIMUM ~OMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 I 4.25 04/t8/2002 3 90605 3200 Unbonded Cap 2 2 4.25 04/22/2002 7 109625 3880 Unbonded Cap 2 3 4.25 05/13/2002 28 Unbonded Cap 2 4 4.25 05/13/2002 28 Unbonded Cap 2 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers. Inc. 01DK Page 3 of 4 Report No.: 147712 I~ll~ ~l~ Project No.: 015729 Client: City of Coppell Water added at site: 10 gallons Sample Location - 50' north x 4' east of southwest corner of paving, turn lane ~ Freeport ne E~.// Technician: Anthony Maldonado Started: 8:00am Finished: 4:00pm Ro Report Distribution: (l) City of Coppell (1) City of Coppell (I) City of Coppell · (1) Schtickcl, Rollins & Assoc., Inc. CIG ~ (1) City of Coppell Project Manager (1) Infrastructure Services, Inc. LIMITATIONS: The test results presented herein wcm prepared based upon the specific samples provided tbr testing. Wc assume no responsibility fur variation in quality (coreposition, appearance, performance, etc.) or any other feature of sireilar subject matter provided by persons or conditions over which wc have no conlrol. Our letters and reports are for thc exclusive usc of thc clients to whore they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers. Inc. 01DK Page 4 of 4