Loading...
ST0001-LR020502iRoneE ngineers 8908 Amb~o_e_*_-dor Row Dsll~ Texss 75247-4S10 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Copp~ll Arm: Ms. Susan Taylor - Engin~ring Dept PO Box 478 Coppell TX 75019 Report No.: 148410 Project No.: 015729 Date of Service: 04/24/2002 Report Date: 05/02/2002 C~.ekview Drive and Frecport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strangth samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS sT~ENGTII: 3000 psi ~ 28 Days SLUMP On): 3" - 5" AIR (%): 3% - 6% TEST MEXaOD: ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTIVl C- 1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: WEATHER CON, mONa: TIME SAMPLED: 9:00am TEMPERATURE (F) - AIR T~UCg NO: 1125 Am CONTENT (%): 4.0 04/24/2002 Cloudy BATCH TIME: 8:26am 75 F CONCRETE: 90 lq' TICKET NO: 7115787 UNIT WEIGHT (per): NA OVERALL PLACEMENT LOCATION: Paving - tom lane of Fr~'port Parkway m Ruby, eastbound apgm:n~h~ on Smt~ and southbound and northbound thlveway lea&ins haw west parking lot, a~d apex of In.flsa of State & Fr~-port no~h & south SAMPLE LOCATION: 5' south x 3' east of northwest REPORT OF TESTS o approach ,t Concrete Compressive Cylin&x 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD b-fI~NGTH FRACTURE SET NO. (inche~) TESTED (d~ys) (lbs. force) (psi) TYPE 1 1 3.0 04/27/2002 3 75455 2670 Uabonded Cap 1 2 3.0 05/01/2002 7 92375 3270 Unbonded Cap 1 3 3.0 05/22/2002 28 Unbonded Cap 1 4 3.0 05/22/2002 28 Unbonded 1 5 Hold LIMITATIONS: The test r~ults presented hercin wm'~ pr~m~d bes~l upon the specific samplm prov/ded for testhg. We assume no respons~ility for variation in quality (composition, appearanoe, performanoe, otc.) or any other feature of s/milar subject matter provided by pa'sons or cond/tions over which we have no comml. Our l~tt~rs and mpom arc for the exclusive use of the clie~lts to whom they ate -~a,'essed and shall not be reproduced except in full without the writton approval of Rime Fa~inocrs, Inc. 01DK Page 1 of 3 Report No.: 148410 RoneEng[n~rs Project No.: 015729 Client: City of Coppell ~l~m Water added at site: 10 gallons LIMITATIONS: Thc test results presented hereto w~e ~-¢~red besed upon the specific samples provided for testing. We assume no responsibility for vn~intion in quality (con~msition, appearance, performance, etc.) or any other feature of similar subject ~ provided by pewons or conditions over which we hnve no control. Our letters and reports a~ for the exclusive usc of the clients to whom they are addressed and shall not be reproduced except in full without the written a~,l~,val of Pone Enginoe~, Ino. 01DK Page 2 of 3 i RoneEng 8908 Ambassador Row Dallas, Tex&s 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Services: City of Coppell ACm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148410 Project No.: 015729 Date of Service: 04/24/2002 Report Date: 05/02/2002 Creekview Drive and Freeport Parkv~y Coppell, TX Obtain samples of fresh coner~¢ at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA ~rRKNGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCR~Tg SUPPLIER: Lattlmore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 6% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTIVI C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 ~'LAC~mnT rATE: 04/24/2002 WEATHER CONDITIONS: Cloudy TIMESAM~'LED: l:05pm BATCHTIME: 12:36pm TEMPERATURE (Ir). AIR 78 F CONCRETE: 90 F TnUC~: ~o: 975 T~Cm~T ~o: 3143682 Am co~rr~rr (%): 4.5 u~Tr WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Paving - tom lane of Frceport Parkway to Ruby eastbound ~:n~.lunants on State and southbound and northbound driveway I,.~di~g into west p~king lot end no~s of median Statc& Frccport north & south SAMPLE LOCATION: 10' north x 8' east of southwest REPORT OF TESTS of west p kins lot Cona~e Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) 2 I 3.25 DATE AGE TESTED (days) 04/27/2002 3 MAXIMUM COMPHESSIV~ LOAD STRENGTH FRACTURE Obs. force) Cml) TYPE 80130 2830 UnbondedCap 2 2 3.25 05/01/2002 7 89780 3170 Unbonded Cap 2 3 3.25 2 4 3.25 2 5 Technician: Allthotly Maldonado Report Distribution: (I) City of Coppcll (1) City of Coppell (1) City of Coppeil (1) Infrestmctu~ Services, Ino. O5/22/2002 28 05/22/2002 28 Unbonded Cap Unbonded Cap HoM Started: 7:30am Finished: 6:00pm (1) City of Coppell (1) Scinickei, Rollins & Assoc., Inc. Pwjeot Mena~ LIMITATIONS: Thc test results presented herein were prepare] based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, pedormancc, ctc.) or any other feature of similar subjec~ mat~' provided by per. es or oonditiom ovcr which we have no cenlrol. Our letters and reports are for thc exclusive usc of the cliants to whom they arc addressed and ~all not be reproduced except in full without thc wrlttcn a~,~, u,'al of Ronc Fmgincm, Inc. 01DK Page3 of 3