Loading...
PA9702-LR 991007 (3)MORTAR COMPRESf' '/E STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 7S247 Date of Service: 08/30/1999 Report No.: 9923518 Report Date 10/07/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr Attn: Bra~P~e~id 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: Obtain samples of mortar from mortar board, identify location of masonry installation for the sample, cast compressive strength samples (2" x 2" x 2" cubes). PROJECT DATA CONTaACrOn: Hisaw & Assoc. MORTAR CLASS: N/A MORTAR SUPPLIER: N/A PLACEMENTDATE: 08/30/1999 BATCH TIME: 2:00pro PLANT: On-site TIME SAMpLED: 2:20pro BY: Del Ratlift SPECIFICATION REQUIREMENTS WEATHER CONVrrXONS: Hot,clear STRENGTH: 1800 psi @ 28 Days TEMpERATURE (E) - AIR 98 F MORTAR: 95 F TRUCK NO: N/A TICKET NO: N/A TESTNLETHOD: ASTMC109 PLACEMENTLOCATION: Eastwallofgym ASTM C270 SAMpLE LOCATION: 10' S of NE gym comer course 19 SAMPLE SIZE: 2"X2"X 2" REPORT OF TESTS CUBE MAXIMUM COMpRESSlYE MARKED DATE AGE LOAD STRENGTH SET NO. TESTED (days) (Ibs. force) (psi) 1 1 09/06/1999 7 5430 1360 I 2 09/27/1999 28 6180 1550 1 3 09/27/1999 28 6430 1610 Average 1580 Technj. cj_an Tj. me: See Report: #9923473 Technician: Del Ratlift Started: Finished: ~/~ ~ Report Distribution: (I) City of Coppell (1) City ofCoppell - Engineeriag (i) BrinkIcy Sargent Architects (l) City ofCoppell - Bldg. Insp. '~ugene Harbour (I) Turner Engineers (1) City of Coppell - Leisure Serv Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writxen approval of HBC Engineering, Inc. 08TMP Page I of I