ST9401-CS 980619Ah
Ask
ST.R'FE,-
ON 'A&o I wo- I- Juno 19, 6 - 3
Construction
of six -lane bridge on
Benton �,
to in to
- summer ,
The q1W I of C4011's por-
The city of Coppal has
construction to improv the
- loon Of construction on North
begun road on
conditionoftheroadway, said
Denton lap°wdl begin this
Wrangler Drive.
Griffin. Portions of the
summer, according to Ken
Improvements include the
eastbound traffic lane will be
Grittin, director of engineer-
necessary paving and drain-
repaired and paved. There
ifig for the city. Improve-
age to eitead the roadway to
will be limited or no
meats will include a new six-
Freeport Parkway. Expected
eastbound traffic from
lane bridge, parving and drain-
completion date is spring of <
Freeport to Denton Tap dur-
age.; In conjunction with the
19W according to Griffin'. At
ing reconstruction Vehicles
road improvements, Brown
the start of the 1998-99 school
will be detoured. to South-
Park Wea4ffl receive 4' new
year access toWrangler Drive.
western Boulevard.
trail system under the bridge
'from Belt Une Road will be
connecting the Brown park
: limited. Drivers should seek
For more information
system. The entire project is
alternate routes.
about current or upcoming
expected to 'take, about 18
Portions- of Bethel Road
road construction, residents
months to cornplete,' said Grif-
from Grapevine Creek, to -
can call the City Engineering
fin.
Fr rt Parkway W A*,
Del"am"t at 3043686.