Loading...
ST0001-LR020429 (4) 8908 Ambassador Row Dmlla% Texas ?$247-4510 (214) 6309745 (214) 630-9S19 (ax) CONCRETE COMPRESSIVE STRENGTH TEST CHeat: City of Coppell Atto: Ma. Susan Taylor- Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Project: CreekviewDrive and Freeport Parkway CoppelL TX Services: Obtain samples of fresh concn~te at the placement locations, perform required field testing, cast compressive strength samples and bring ssmples back to thc laboratory for curing and testing in accordance with applicable stnndexds. PROJECT DATA $-rK~N~-rll: SLUMP fro): Am(%): connectoR: Infrastructure Services, Inc. coNc~rg strepL~m ~o~ p~: 7 SPEC~CATION ~OV~ 30~ psi ~ 28 Da~ 3% - 5% AS~ C-172 AS~ C-31 AS~ C-143 AS~ C-231 AS~ C-1064 ' AS~ C-138 ~ C-39 M~X Or-SIGN LO.: 38 ~Ac~,m~rr OAT~: 04/19/2002 ~A~ commons: Cl~ ~ s~o: 7:05~ ~T~ ~: 6:0~ ~r~-~ 80 F ~N~: 90 F ~uczso: 1~5 ~T~O:' 7115618 m CO~ (%): 3.5 ~ ~m~ ~: NA SAMPLE LOCATION: 35' east x 5' south of norlhwest REPORT OF TESTS ofpa s, outh Concrete Compressive Cylinder 6" x 12" (area 28.27 SCl. in.) CYLINDER MEASURED MARleD SLUMP ~ (inches) MAXIMUM COMPRESSIVE DATE AGE LOAD SITZNG]'ti TEsr~O (days) Obs. force) (psi) 2.5 2.5 2.5 2.5 04/22/2002 3 04/26/2002 7 05/17/2002 28 05/17/2002 28 Hold 90975 3220 98990 3500 Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: Thctest results p~semted heminwe~lW~nred based upon the specific s~jlesprovided for testin~ We assume no rmpomibility for vnrintion in quality (composition, nppezmnce, perfotmnnee, etc.) or any other fentme of slmil~' subject maR~ pmvlded by persons or conditions over which we have no contzol. Our letters and reports are fl~r the exclusive use of the clients to whom they are addressed and ~hnll not be ~oduced except in full without the writte~ ap~oval of Rone E%olneets, Inc. 01DK Page I of 13 Report No.: i48080 RormEngineers Project No.: 015729 ~J/ Client: City of Coppell Water added at site: 10 gallons LIMITATIONS: The test results presented he~/n we~ pre, pared based upon the specific samples provided for testing. We assume no ruspous~il/ty for variation in quali~ (composition. app~m~e, performance, etc.) or any other feature of s/milar subject mn-~' prov/ded by permus or conditions over which we have no control. Our letters and reports are for the exclusive usc of ~he clients to whom thcy are addressed and shall not be ,~v~luced except in full w/thout the written a~.~oval of Rone F. nghee~, Inc. OlDK ]Page 2 of 13 neem 8908 Amb~_*dor Row I~II.L. Temm ?$247-4510 (2]4) 630-~745 C~]4) ~-9s]9 (fax) CONCRETE COMPRESSIVE STRENGTH TEST CHent: City of CoppeH Aim: Ms. Susan Taylor- Engineering Dept PO Box 478 CoppeH TX 75019 Report No.: 148080 Project No;: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Project: SeFvices: Creek-view Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at thc placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and teeing in accordance with npplicnble ~tandards. PROJECT DATA STRENG'rH: SLUMP (In): Am (%): T~ST METHOD: cot~rTEAcrom lnh, astmcture Services, ~nc. CONCRETE SUPPLIER: Lattimoro PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - $ '' 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM (2-39 MIX DESIGN LD.: 38 ~LAC~w~rr DATE: 04/19/2002 WEATI~R CONOmONS: Clear TIM~SAMPLED: 8:40am BATCl~TIME: 8:06~m TEMPERA~tn~(~-Am 82 r CONC~TE: 90 F ~UC~NO:. 938 ~C~T~ 7115627 ~ co~ (%): 4.5 ~ ~]a~ ~: HA O~t.~. P~ ~A~ON: ~ - ~, ~ ~e ~ Sm~ ~ m S~ 17~0 SAMPLE LOCATION: Station 2+00 REPORT OF TESTS Compressive Cylinder 6" x 12" (n~ea 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGkH FRA~.-i-KIR~ SET NO. Ouches) TEST~-D (days) Obs. force) (psi) TYPE 2 1 2.5 04/22/2002 3 91245 ' 3230 Unbonded Cap 2 2 2.5 04/26/2002 7 108370 3830 Unbonded Cap 2 3 2.5 05/17/2002 28 Unbonded Cap 2 4 2.5 05/17/2002 28 Unbonded Cap 2 5 Hold LIMITATIONS: The test results presented hcrein were ~.~ed based upon the specific samples provided for teeing. We assume no responsibility for variation in quality (con~os'ltion, appcaraaco, pe~forll~lIlCe, etc.) or any other ~ ofslmil~r aubject matter provided by pe~ous or conditiom over which we have no comroL Our lette~ and t~ports are for the exclusive use of the climts to whom they are addressed nnd shall not be reproduced exoept in full without the wri~n app,oval of he Engineers, Inc. 01OK Page 3 of 13 Project: 8908 Ambassador Row Dallas, Texas 7S247-4S10 (214) 630-974S f~14) c,3e-ssl9 (ax) CONCRETE COMPRESSIVE STRENGTH TEST City of Coppell Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 CoppeH TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Creek'view Drive and Freeport Parkway CoppeH, TX Obtain samples of fresh concrete at the placement Iocetion~ perform required field testing, cast compt~ive strength sample~ and bring samples back to the laboratory for curing and testing in accordance with applicable ~andards. PROJECT DATA $'IRENGTH: SLUMP (in): Am (%): T~ST bl~TitOD: coNT~croa: ~frastmcture Services, Inc. CONCI~T~ SUPPLIER: ~O~ P~: 7 S~C~ICA~ON ~Q~ 3000 psi ~ 28 Da~ 3" - 5" 3% - 5% AS~ C-172 ~ C-31 AS~ C- 143 ~ C-231 AS~ C-10~ AS~ C-138 AS~ C-39 MIX DESIGN LD.: 38 PLAC~bl~NT DAT~: 04/19/2002 w~macon~mo~ts: Partly cloudy TIM~SAiVn'LED: 10:30am SnTC~Tn~: 9:02am TEMPERATURE (F) - AIR 82 g CONCRETE: 90 F 'rat~cs: no: 1093 TIOmT nO:. 7115637 Am co~'a'z~r (%): 4.25 tnvrr w~mm' {p~O: NA OVERALL PLACEMENT LOCATION: Paving - Creekvinw, sou~ lane eastbound, Station 0-~ to Station 17+00 SAMPLE LOCATION: Station 3+75 REPORT OF TESTS Conct~-te Cor,~p~e,~sive Cylinder 6# x 12" (area 28.27 sq. in.) CYLINDER MEASURE~ MARKED SLUMP DATE AGE SET NO. (Inches) TESTED (days) 3 1 2.25 04/22/2002 3 3 2 2.25 04/26/2002 7 3 3 2.25 05/17/2002 28 3 4 2.25 05/17/2002 28 3 5 Hold MAXIMUM COMPR~SSIV~ LOAD ,$'r~,~Nt~rtl lrRA~.T ORI~ (lbs. force) (I~i) ~ 80015 2830 Unbonded Cap 90835 3210 Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented hat~u we~ prepared based upon thc specific ,urn?les provided for testing. We assume no responsibility for vndntion in quality (composition, appearance, performsnce, etc.) or eay other feature of similar subject mat~er I~ovided by persons or conditlom over which we have no control. Our letters ucd reports are for the exclusive use of the clients to whom they are nddressed and shall not be reproduced except in full without the wfi~m a~o,,~val of Rone Euglnee~, Inc. 01DK Page 4 of 13 ineer$ · 89~ &mb~dor Row ~ T~.. 75247-4510 (~4) 63o~74s (214) 6309819 (fax) CONCRETE COMPRESSIVE STRF. NGTH TEST Client: Project: Services: City of Coppell Aim: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 l~'ojeet No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Creekview Drive and Freeport Parkway ¢oppeU, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive slrangth samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP On): AIR (%): TEST METHOD: co.reACTOr: Infrastructure Services, Inc. CONCRETE SUPPLIER: LRttilnor~ PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi (~ 28 Days 3" - 5" 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: .~8 PLACEMENT DATE: WEATHER CoNomON8: TIME sA~n'L~D: 1:2~m ~ ~o: 1106 ~ co~ (%): 4.0 04/19/2002 Cloudy SATCn ~: 12:41pm 85 F CONC~TE: 90 F TICKET NO: 3143432 u~rr wgia~rr ~'0: NA OVERALL PLACEMENT LOCATION: Paving - Crenkview, south lane eesibmmd, Stminn 0+00 to Stafien 17+00 SAMPLE lOCATION: Station 5+25 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET NO. Onches) TESTED (days) Obs. force) 4 1 2.5 04/22/2002 ~ 3 92295 4 2 2.5 04/26/2002 7 100175 4 3 2.5 05/17/2002 28 4 4 2.5 05/17/2002 28 4 5 Hold 3260 Unbonded Cap 3540 Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results pre~entcd he~eln were p~eparcd based upon the spccific ~mpl~ providod for testing. We a~lune no responsibility for variation in quality (composition, appesranoe, pedomumc~, eta.) or any other feature of similar subject matter provided by persons or conditions over wh/oh we have no c~n~ol. Our letters and reports are for the exclusive use of thc clients to whom they are nddr~sed and =hAll not be reproduced except in full without the wr/tien app~val of Rone Engineers, Inc. 01DK Page 5 of 13 Report No.: 148080 RormEngin~rs Project No.: 015729 Client: City of Coppell Water added at site: 5 gallons LIMITAT/ONS: The test results presented he.in we~'e prepared ba.~ed upon tho specific ~n?tes provided for teeing. We e~une no responsibility for varisfion in quslity (composition, appearance, pcrfomumce, etc.) or any other feature of similsr subject mat~cr provided by persons or conditions ove~ which we have no conh. oi. Our letters and reports are for the exclusive use of thc clients to whom they arc addressed and shall not bc ~.~,,~duccd except in full without thc written approval of Ronc F.,ngineef3, Inc. 01DK Page 6 of 1~ Project: Services: 8908 Amtnundor Row Dslln% T~it 7S247-4510 (214) (214) 630-9819 (hx) CONCRETE COMPRESSIVE STRENGTH TEST city of Coppell Aim: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 7:5019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Crcekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, peril,., required field tearing, cast compressive strength ~mnples and bring samples back to the Inboratory for curing nnd tinting in accordnnce with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONT~croI~ Infrastructure Services, Inc. CONCRETE SUPPLIER: Latt~ore PL~r.. 7 SPECIFICATION R~QUIR~MENTS 3000 psi ~ 28 Days 3" - 5" 3% ~ 5% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 - ASTM C-1064 ASTM C-138 ASTM C-39' MIX DESIGN LD.: 38 PLACEMENT DATE: 04/19/2002 WEATHER CONDmONS: Partly cloudy ?nm~SA~OLED: 2:35pm nATCtl~ME: 1:57pm TEar, RACe-Am 85 F CONC~TE: 92 F ~UC~NO: 757 ~C~T NO: 7115666 Am CONTEWr (%): 4.75 uNrr w~[~rr (~0: NA OVERALL PLACEMENT LOCATION: Paving - ~w, sout~ hnc m~boun,~ Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 7+60 REPORT OF TESTS Concrete Con~presaive Cylinder 6" x 12" (nrta 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPI~SSIVE MARI~D SLUMP DATE AGE LOAD ~rREN~fr~ FRA~.-rURE SET NO. (inch.-) TEbi'i~D (dayO 0ba foree) (pd) TYP~ 5 1 2.0 04/22/2002 3 94700 3350 Unbonded Cap 5 2 2.0 04/26/2002 7 105295 3720 Unbonded Cap 5 3 2.0 05/17/2002 28 Unbonded Cap 5 4 2.0 05/17/2002 28 Unbonded Cap 5 5 Hold LIMITATIONS: The test result~ presentod he~in we~ prepared based upon the speclfte samples provided for tesi~tg. We esanme no re~o~thili~ for variation/n quality (composition, appcarance, performance, e~c.) or any other feature of ~"i!*, ~ul~zt ~"ff_ provided by pc~ons or conditiom over which we have no conlrol. Our letters and reports are for the exclusive use of the clicnts to whom they are eddresscd and shall not be ,zl~luccd exccpt in full without the wriRon al~uval of Rone Engineers, Inc. OlDK Page 7 of 13 Report No.: 148080 RoneEn~ln~ Project No.: 015729 ~g~ Client: City of Coppell Water added at site: 5 gallons LIMITATIONS: The test results presented herein we~ prepored b~ed upo~ ~c R~ecific aamplm provided for tgsting. We assume no responsibility for ~ in qualily (composition, appi~ a~ce, pcr~rmance, etc.) or any other feature of similar subject matter provided by petsolls or conditions over which we have no oontml. Our letters and ~"ports are for She exclusive use of thc clients to whom they arc addressed and shall not ha replDduced except in fllll without the w~itlem ~uC, vltl ofRone Enginoer~, Inc. 01DK Page 8 of 13 ineers 8909 Ambassador Row Dultu, T~-- ?S247-4S10 (214) (2~4) 630-9819 CONCRF TE COMPRF SSIVE STRI ,NGTH TEST CHen~. City of Copp~ll Atto: Ms. Susan Taylor - Engin~rin8 D~t PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Services: Cr~kvi~w Driv~ and Freeport Parkway Coppell, TX Obtain samples of fresh concrete nt the plncemant locations, perform required field testing, cast compressive strength scruples md bring samples b~ck to the laboratory for curing and testing in accordance with applicable standnrds. PROJECT DATA STRENG'rtl: SLUMP (In): AIR (%): TEST METHOD: co~rrn~croa: Infrastructure Services, Inc. CONCRETE S~PL~ER: Latthnore PL,~rr: 7 SPECIFICATION REQUIREMENTS 3000 psi ~' 28 Days 3" - 5" 3% - 5% ASTM C-172 ' ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN LD.: 3~ ~'LAC~MEI~rr DATE: 04/19/2002 WEATflER CONDITIONS: ~~o: 4:35pm ~T~: 2:llpm ~E~-~ 86 F CON~: 90 F ~u~so: 973 ~T~O: 7115670 ~ CO~ (~): 4.0 ~ ~G~ ~m: HA O~ P~ ~A~ON: SAMPLE LOCATION: Station 9+30 REPORT OF 'TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE LOAD SET' NO. ('tuches) TESTED (days) Obs. force) 6 1 2.5 04/22/2002 3 6 2 2.5 · 04/26/2002 7 6 3 ' 2.5 05/17/2002 28 6 4 2.5 05/17/2002 28 6 ' 5 Hold COMPRESSIVE STBEN~rn lrP. ACl-UR~ 80170 2830 UnbondedCap 99385' 3510 UnbondedCap Unbonded Cap Unbonded Cap LIMITATIONS: Thc test results presented herein were pre~ based upon the specific lmm?les provided for testing. We mm no responsibility for variation in quality (compos/fion, appearance, performs,ce, otc.) or any other fcamre of sim/hr subjeot mae. er pwvkkd by p~om or conditions over which we hnve no control. Our letIcrs and reports are for the exclusive use of the clients to whom they are addressed and shsll not be reproduced except in full without the written a~p~ovnl of Rone Engineers, Inc. 01DK Page 9 of 13 8908 Amb---_-dor Row Dallas, T~-. 75247-4~10 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST CHent: City.of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 7S019 Report No.: 148080 l'roje~t No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Services: Creek'view Drive and Fre~lml~ Parkway CoppoH, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compresmve stretch samples and bring sample~ back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA ,%-fl~ENGTH: SLUMP (in): AIR (%): TEST METHOD: co~a~croa: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattim ore PLA~r: 7 SPECIFICATION REQUI~MENTS 3000 psi ~ 28 Days 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 38 rt, AC~MEr~r DA~: 04/19/2002 w~THERCOnOmoss: Partly cloudy ~MESA~UZD.. 4:15pm BATCHTIM~: 2:45pm TEM~RATInt~ff)-Am 85 F CONCRETE: 90 F TaUCKNO: 1050 TIC~C~TNO: 3143452 Am conrz~r (%): 4.25 tn~r W~IGaX C~0: NA OVERALL PLACEMENT LOCATION: Paving - Creeiodew, south lane eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 10+75 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (~res 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (pd) TYPE 7 1 2.25 04/22/2002 3 85250 3010 Unbonded Cap 7 · 2 2.25 04/26/2002 7 96920 3430 Unbonded Cap 7 3 2.25 05/17/2002 28 Unbonded Cap 7 4 2.25 05/17/2002 28 Unbonded Cap 7 5 Hold LIMITATIONS: The test results presented herein were pt.-patti based upon thc specific ~mple~ Imovid~l for t~ting. We assumo no responsibility for variation in quality (compusition, appearance, performance, cts.) or any other feature of similar ~lbj~'t IBatter p[ovld~d by ~ or O01uliti~ls ove~ which we have no control. Our lette~ and rzports ar~ for the exclusive use of the cliffs to whom they nye adt~essed and shall not be reproduced except in full without the written approval of Rone Fa~neers, Inc. 01DK Page 10 of 13 Report No.: 148080 RoneEn~ineers Project No.: 015729 ~,~ ~ Client: City of Coppell Water added at site: 10 gallons LIMITATIONS: The test results p~sented herein were 9,~ared based upon gte specific sn-B?~e~ provided for tcst~._e We assume no responsibility for variation in quality (composition, appeerallce, performance, etc.) or any other feature of~imil,~- subject matter provided by persons or conditions ~ver which we have no conUol. Our let'ters and reports arc for the exclusive use of the cl;e-~ to whom they are addressed and shall not be ~-'produced except in foil without the writ~ea ,~l,Y~oval of Ronc F. ni~nee~, Inc. O1DK Page 11 of 13 Ineers: 8905 Ambassador Row ~ Tins 75247-4S10 (214) 630-9745 (214) 63o-9~i9 Client: C~ty of Coppell Atto: Ms. Susan Taylor - Engineering Oept PO Box 478 Coppell TX 75019 'CONCRETE COMPRESSIVE STRF, NGTH TEST Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Project: Services: Creekview Drive and Freeport Parkway Copp~n, TX Obtain samples of fresh coner~ at the placement locations, lXrfonn required field testing, cast ~prmsive strength samples and bring smnples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: lnfrastructul'o Scl'Vices, Inc. MIX DESIGN LD.: 38. CONCRETE SUPPLIER: LaUJmorc PLACEMENT DATE: 04/19/2002 rta~rr: 7 WEATHERCOm~moNs: Partly cloudy SPECIFICATION REQUIREMENTS TIMESAMPI~D: 5:15pm BATCheS: 4:lgpm ST~NGTa: 3000 psi ~ 28 Days TESU~aATURE0~-Am 85 r coNcRETE: 90 r SLUSn,(a): 3" - 5" TRUOCNO: 746 T~OmX~qO: 6173396' ~ (%): 3% - 5% Ant CONTENT (%): 4.5 unrr WEIGHT (pc0: NA TEsr SmTnOD: ASTM C- 172 OVrRArL PLACESmNT LOCATmN: ASTM C-31 Pavins- Cr~kvi~w, sou~ hne ~a~tbon~ Station 0+00 to Station 17+00 : ASTM C-143 · ASTM C-231 ASTM C-1064 ASTM C-138 SAMPLE LOCATION: Station 12+60 ASYM ¢-39 RF PORT OF TESTS Conu, c,t~ Compressive Cylinder 6" x 12" (area 28.27 SCl. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STREN~-flt FRAc-i'URE SET NO. (lnehm) TESTED (day~) 0b~. for~) (IM) TYPE 8 1 2.5 04/22/2002 3 89680 3170 Unbouded Cap 8 2 2.5 04/26/2002 7 103795 3670 Unbonded Cap 8 3 2.5 05/17/2002 28 Unbonded Cap 8 4 2.5 05/17/2002 28 .Unbonded Cap 8 5 Hold LIMITATIONS: The test rmults presented h~ein were pre~ based upon Oae speciflo sn?les provided for te~ng. We u~m~ no r~ponsibih'ty for variation in quality (composition, alrpeanm~e, ~nee, etc.) or a~y other fenture of similar subject n~_~ providcd by gna-ams or conditions ove~ which we have no control. Our letters and reports ~e for ~he exclusive use of ~hc clients to whom thcy am addressed and shall not b~..~,,~uced cxcept in full wi~ou~ the writ~ ~,b~.,val of Rone Engineers, Inc. 01DK Page 12 ofl3 :neers: CUent: 890~ Ambamdor Row D. II~, Tex~ 75247-4S10 (214) ~745 014) ~19 (fax) CONCRETE STRENGTH TEST City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148080 Project No.: 015729 Date of Service: 04/19/2002 Report Date: 04/29/2002 Project: services: Creekview Drive and Freeport Parkway Coppell, TX Obtain smnples of fresh con~o at thc phu~:ment locations, perform required fie~d f~Jting, cost compressive streo~h smnplcs and bring samples back to the lnboratm'y for curing and testing in nccordnnce wi~h applicable standards. PROJECT DATA STRENGTH: SLUMP On): AIR (%): TEST METHOD: CONTRACTOR~ Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattlmoro Pt,~rr: 7 SPECIFICATION R~QUIREM~NTS 3000 psi ~ 28 Days 3" - 5" 3% -5% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-I064 ASTM C-138 ASTM C-39 MIX DESIGN LD.: 38 PLAC~ME~rr DATE: 04/19/2002 WEATIIER CONDmONS: Partly cloudy ~MESAM~LED: 6:05pm BA'rCnT~ME: 5:17pm TEMPERATURE (F).Am 86 F CONCRETE: 90 F TEucx NO: 1118 TIC'~? NO:. 6173407 ~m CONTE~rr (%): 4.0 uNrr WglGItT (pc0: NA OVERALL PLACEMENT LOCATION: Paving - Creekview, ~tth Inne eastbound, Station 0+00 to Station 17+00 SAMPLE LOCATION: Station 14+55 REPORT OF TESTS Concrem Compressive Cylinder 6" x 12" (area 28.27 gl. in.) CYLINDER MEASURED MARKED SLUblP SET NO. One. h,-,) 9 1 2.0 MAXIMUM DATE AG~ LOAD TESTED (days) 0bs. force) 04/22/2002 3 85235 COMPRESSIVE (~-,) 3010 FRACTURE TYPE Unbonded Cap 9 2 2.0 04/26/2002 7 102765 3630 UnbondedCap 9 3 2.0 9 4 2.0 05/17/2002 28 05/17/2002 28 Unbonded Cap Unbonded Cap 9 5 Technician: Anthony Maldonado Relmr~ Distribution: (I) City of Copl~ll (1) c~ of coppen (1) city of C. oppeU (1) lafl'asm~tur~ S~vic~, Inc. Hold Stsrted: .6:00am Finished: 8:30Pm (1) City of Coppell (1) Sohrlok~ l~qll~n. & A~oc., Inc. Rone //hie. LIMITATIONS: The test results presented herein were ~-~..~cd based upon the spec/ftc samples provided for t~at~g. We assume, no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by penons or conditions over which we have no control. Our le~en; and reports nrc for the exclusive use of the clients to whom they are ,dd~sed and shall not be ,~,,,,duced exo~t in full without the written ap/~oval of Rtme Engineers, Inc. 01DE Page 13 of 13