Deforest Court-LR020514REPORT OF DRILLED PIER OBSERVATION
Report Number: 94021148.0007
Service Date: April 30, 2002
Client: The Holmes Builders
Attn: Jon DostertJDean Trudell
1406 Halsey Way Suite 100
Carmllton TX 75007
Report Date: May 14, 2002
Project: 618 DeForest Court
Single Family Home
Coppell, Texas
Project Number: 94021148
8901 Carpenter Fn~/., Suite #100
Dallas; Texas 75247
(214) 630-1010
Services: Ddlled pier observation
On this'date, an HBC Engineering technician arrived at the above referenced jobsite as scheduled for
drilled pier observation. See the attached sheet(s) for recorded data.
NOTE: HBC's technician was unable to determine the plumbness of the piers.
Technician: Steve Campbell
Report Distribution: HBC.,.Engineering
(1) The Holmes Bulidem Reviewed by: ussel~bu'nH.A
(1) City of Coppell - Constr Inep H . saad, P.E.
(1) City of Coppell - aldg Inep Senior Project Managor
The tests were po~ormod in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the uae of the ~
indioatecl above and shall n~ be reproduced excapl in full without the written approval of Terracon. Test results transmitted herein ara only applicable
to the actual samples tested at the location(s) referenced and are nol necessarily indicative of the properties of other apparently similar or identical
materials.
Page 1 of 1