Loading...
SW0001-CS020429WEEKLY PROJECT STATUS REPORT DATE: CLIENT: PROJECT: April 29 - May 3, 2002 City of Coppell Riverchase Elementary School PROJECT NO.: BY: REVIEWED BY: 2230-01.148 Bradley J. Moss Steve A. Markussen Date 05/03 cc: Item BJM informed Mike Millican with Aguirre Corporation that the elevation of the proposed Star Leaf pavement differs from the elevations at the existing curb of Star Leaf by approximately one foot. We both concurred that we used the same benchmarks. He will verify if our topo is correct, and if so will make adjustments to his paving plan. Mr. Millican felt that our topo was correct and to proceed with our design of the sidewalk. City of Coppell - Kenneth Griffin BJM/slt 2230-20