Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CF-Coppell Rd SC-LR020509
Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF ANALYSIS OF ASPHALTIC CONCRETE CLIENT: Texas Unified Constructors, inc. DATE: 9 May 2002 PROJECT: Field Service Offices & Maintenance Facility Coppell, TX JOB NO.: 01.1054 SAMPLES: LOCATION: Taken by a representative of Hooper Engineering Laboratories, Inc. on 5/9/02. Southwest parking lot-sample taken along west side, approx. 0'-30' north of south curb SIEVE SIZE % PASSING RETAINED ON 1" 100.0 7/8" 100.0 7/8" 3/8" 32.2 3/8" No. 4 21.6 No. 4 No. 10 16.9 Total retained on No. 10 70.7 No. 10 No. 40 10.0 No. 40 No. 80 5.6 No. 80 No. 200 5.3 No. 200 3.3 Asphaltic Cement 5.1 Unit Weight 151.3 pcf SPECIFICATION REQUIRMENTS THD 340, TYPE "B" BASE COURSE 100 95 - 100 21 - 53 11 - 42 5 - 26 58 - 74 6 - 32 4-21 3-21 1-8 3.5 - 7.0 TECHNICIAN: DISTRIBUTION: MFM (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148