Loading...
CF-Coppell Rd SC-LR020416 (2)Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Texas Unified Constructors, Inc. PROJECT: Field Service Offices & Maint. Fac., Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 01.1054 DATE: 1 6 April 2002 SUPPLIER: Lattimore Paving, west fire lane, 30'-50' north of south curb at approach, 0'-8' east of west curb Paving, west fire lane, 20'-40' south of north curb at 10'-18' west of east curb SAMPLE DATA: SET 1 SET 2 Truck No. 757 955 Ticket No. 7115487 7115490 Time Batched 6:35am 6:55am Time Sampled 7:05am 7:41am Concrete Temp. (ASTM C1064i 68°F 70°F Air Content (ASTM C2311 3.2% 4.1% Unit Weight (ASTM C138) MIX NO. 64 Cement Flyash Sand iQ. 1.0 in. Water Admix #1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS [ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date PoUnds Strength 28-Day {ASTM C143) psi Strength 201 2.50 7 04/23/02 202 2.50 28 05/14/02 203 2.50 28 05/14/02 204 4.00 7 04/23/02 205 4.00 28 05/14/02 206 4.00 28 05/14/02 115,000 4070 132,10Q 4670 135,600 480Q 28-Day Average 4740 96,20O 3400 118,0Q0 4170 123,300 4360 28-Day Average 4270 3500 35OO TECHNICIAN: DISTRIBUTION: CBC (6:30am-8:30am) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texaa 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Texas Unified Constructors, Inc. PROJECT: Field Service Offices & Maint. Fac., Coppell LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 01.1054 DATE: 16 April 2002 SUPPLIER: Lattimore Paving, west fire lane, 0'-10' south of north curb and 60'-80' west of east curb Paving, west fire lane, 10'-20' south of north curb and 120'-140' west of east curb SAMPLE DATA: SET 1 SET 2 Truck No. 180 1040 Ticket No. 7115496 7115505 Time Batched 7:27am 9:04am Time Sampled 8:40am 9:45am Concrete Temp. (ASTM CLO64) 72°F 72°F Air Content (ASTM C231) 5.2% 4.8% Unit Weight (ASTM c13a~ MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA 64 COMPRESS/VE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 207 4.75 7 04/23/02 208 4.75 28 05/14/02 209 4.75 28 05/14/02 210 4.00 7 04/23/02 211 4.00 28 05/14/02 212 4.00 28 05/14/02 106,500 377O 137,200 4850 135,200 4780 28-Day Average 48Z0 89,600 3170 115,000 4000 111,200 3930 28-Day Average 3970 3500 3500 TECHNICIAN: DISTRIBUTION: CBC (8:30am-10:30am) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01,1054 CLIENT: Texas Unified Constructors, Inc. DATE: 16 April 2002 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, west fire lane, 280'-300' east of S. Coppell Rd. and 0'-10' north of south curb LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 808 Cement Ticket No. 6173018 Flyash Time Batched 10:47am Sand Time Sampled 11:30am in. Concrete Temp. (ASTM C1064~ 72°F 1.0 in. Air Content (ASTM C231) 5.6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 64 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 213 5.00 7 04/23/02 214 5.00 28 05/14/02 215 5.00 28 05/14/02 105,600 3740 137,500 4860 142 ~QO 5020 28-Day Average 4940 3500 TECHNICIAN: DISTRIBUTION: CBC (11:00am-12:30pm) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 01.1054 CLIENT: Texas Unified Constructors, Inc. DATE: 16 April 2002 PROJECT: Field Service Offices & Maint. Fac., Coppell SUPPLIER: Lattimore LOCATION OF POUR SET 1: Paving, west fire lane, 140'-165' east of S. Coppell Rd. and 13' south of north curb LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 805 Cement Ticket No. 6173032 Flyash Time Batched 12:03pm Sand Time Sampled 1:00pm in. Concrete Temp. (ASTM C1064) 76°F 1.0 in. Air Content IASTM C231) 4.8% Water Unit Weight (ASTM C138) Admix 81 Admix //2 AEA 64 COMPRESS/VE STRENGTH TESTS IASTM C39~ (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive ReqUired Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 216 4.75 7 04/23/02 217 4.75 28 05/14/02 21 8 4.75 28 05/14/02 83,800 2960 109,600 3880 112,000 3960 28-Day Average 3920 3500 TECHNICIAN: DISTRIBUTION: JLS (12:30pm-2:30pm) (3) City of Coppell (1) Vidaud & Associates (1) Doyle Engineering Group (1) Texas Unified Constructors, Inc. 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148