Loading...
ST0001-LR020506 (4):ROneEn g,neers %Tooo ] 8908 Ambassador Row Dallas, Texas 75247=4510 (214) 630-9745 (214) 630-9819 (fax) REPORT .OF CYLINDER COLLECTION Client: City of Copper Arm: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Project: Creek'view Drive and Freeport Parkway Coppe]l, TX Services: Cylinder Collection Report No.: 148784 Project No.: 015729 Date of Service: 04/30/2002 Report Date: 05/06/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page 1 of 1 Technician: Eric Branch Report Distribution: (1) City of Coppoll (1) City of Coppell (1) City of Coppell (1) Infrasmacmre Services, Inc. 6:30am - 8:00am (1) City of Coppcll (1) Schfickcl, Rollins & Assec., Inc. ~ Stark Project Manager LIMITATIONS: Thc test results pmsanted herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by pessons or conditions over which we have no control. Our letters and reports are for the exclusive usc of the uliants to whom they arc addressed and shall not be reproduced except in full without thc written approval of Rone Engineers, Inc. 99DK Page 1 of 1 RoneEn g,neers Client: City of Coppell Atto: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Cylinder Collection 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax} REPORT OF CYLINDER COLLECTION Report No.: 148698 Project No.: 015729 Date of Service: 04/27/2002 Report Date: 05/06/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page 1 of 1 Technician: Eric White Ron~/~; Report Distribution: (1) City of Coppell (I) City of Coppell . (I) City of Coppcll (1) Schr/ckel, Roll/ns & Assoc., Inc. (l) City of Copl~ll Proj (l) Infrastmcturc Services, Inc. 7:30am - 9:30am ? Stark Manager LIMITATIONS: The test results presented herein were prcparod based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appcarancc, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports arc for the exclusive usc of thc clients to whom they arc addrossed and shall not be mpwduced except in full without the written approval of Rone Engineers, Inc. 99DK Page I of 1 RoneEn gineers Tboa/ 8~$ A~hassadar R~w Dallas, Texas 75247=4510 (214) 630-9745 (214) 630=9819 (fax) REPORT OF CYLINDER COLLECTION CHeat: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept, PO Box 478 Coppell TX 75019 Project: Creekview Drive and Freeport Parkway Coppell, TX Services: Cylinder Collection Report No.: 148461 Project No.: 015729 Date of Service: 04/25/2002 Report Date: 05/06/2002 Report of Collection On this date, a Rone Engineers, Inc. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: Page 1 of 1 7:00am - 9:00am Technician: Cody Carroll Report Distribution: (1) City of Coppell (1) City of Coppell (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. C (1) City of Coppell Pro (1) Infrastructure Services, Inc. ty Stark ect Manager LIMITATIONS: The tnst results presented herein were prepured bused upon the specific sampl~ ~vid~ for t~ We assumeno responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of shnilar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 99DK Page 1 of I ineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630=9745 (214) 630=9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City ofCoppeU Atm:Ms. SusanTaylor-Engineering Dept PO Box 478 CoppellTX75019 Report No.: 148627 Project No.: 015729 Date of Service: 04/26/2002 Report Date: 05/06/2002 Creek-view Drive and Freeport Parkway Coppell, TX Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): T~ST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: TX~ PLANT: 41 SPECIFICATION REQUIREM~.NTS 3000 psi ~ 28 Days 3% - 5% ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 M~X DESIGN I.O.: 8274 PLACEMENT DATE: WEATHER CONDITIONS: TIME SAMPLED: 9:40am TEMPERATURE (F) - AIR TRUCK NO: 462 Am CONTENT (./.): 4.5 04/26/2002 Cloudy BATCH TIM~: 8:01am 70 ~ CONCRETE: 80 ~r TICI~mT NO: 3119797 UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Red ~am? enll'ance to Wagon Wheel Park at Creekview Drive SAMPLE LOCATION: REPORT OF TESTS 10' east x 5' north of southwest comer of red stamped entrance Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 3.5 04/29/2002 3 124155 4390 Unbonded Cap 1 2 3.5 05/03/2002 7 143410 5070 Unbonded Cap I 3 3.5 05/24/2002 28 Unbonded Cap 1 4 3.5 05/24/2002 28 Unbonded Cap 1 5 Hold LIMITATIONS: The test results presented he.in were prepared based upon the specific samples provided for testing. We assume no ~ponsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page I of 2 Report No.: 148627 Project No.: 015729 Client: City of Coppell Water added at site: 5 Technician: Eric White Report Distribution: (1) City of Coppell (l) City of Copp~ll (1) City of Coppell (I) Infrastmcturo Services, Inc. gallons Started: 8:30am (1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. Finished: 10:30am RoneEilavS k~-' Project Manager LIMITATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. Wc assumc no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for thc exclusive use of the clients to whom they arc addressed and shall not be r~roduced except in full without the written approval of Ron¢ Engineers, Inc. 01DK Page 2 of 2