ST0001-LR020506 (4):ROneEn g,neers
%Tooo ]
8908 Ambassador Row
Dallas, Texas 75247=4510
(214) 630-9745
(214) 630-9819 (fax)
REPORT .OF CYLINDER COLLECTION
Client:
City of Copper
Arm: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Project: Creek'view Drive and
Freeport Parkway
Coppe]l, TX
Services: Cylinder Collection
Report No.: 148784
Project No.: 015729
Date of Service: 04/30/2002
Report Date: 05/06/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time:
Page 1 of 1
Technician: Eric Branch
Report Distribution:
(1) City of Coppoll
(1) City of Coppell
(1) City of Coppell
(1) Infrasmacmre Services, Inc.
6:30am - 8:00am
(1) City of Coppcll
(1) Schfickcl, Rollins & Assec., Inc.
~ Stark
Project Manager
LIMITATIONS: Thc test results pmsanted herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by pessons or conditions over which we have no control. Our letters and
reports are for the exclusive usc of the uliants to whom they arc addressed and shall not be reproduced except in full without thc written approval of Rone Engineers, Inc.
99DK Page 1 of 1
RoneEn g,neers
Client:
City of Coppell
Atto: Ms. Susan Taylor - Engineering Dept
PO Box 478
Coppell TX 75019
Project: Creekview Drive and
Freeport Parkway
Coppell, TX
Services: Cylinder Collection
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax}
REPORT OF CYLINDER COLLECTION
Report No.: 148698
Project No.: 015729
Date of Service: 04/27/2002
Report Date: 05/06/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time:
Page 1 of 1
Technician: Eric White Ron~/~;
Report Distribution:
(1) City of Coppell (I) City of Coppell .
(I) City of Coppcll (1) Schr/ckel, Roll/ns & Assoc., Inc.
(l) City of Copl~ll Proj
(l) Infrastmcturc Services, Inc.
7:30am - 9:30am
? Stark
Manager
LIMITATIONS: The test results presented herein were prcparod based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appcarancc, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports arc for the exclusive usc of thc clients to whom they arc addrossed and shall not be mpwduced except in full without the written approval of Rone Engineers, Inc.
99DK Page I of 1
RoneEn gineers
Tboa/
8~$ A~hassadar R~w
Dallas, Texas 75247=4510
(214) 630-9745
(214) 630=9819 (fax)
REPORT OF CYLINDER COLLECTION
CHeat:
City of Coppell
Attn: Ms. Susan Taylor - Engineering Dept,
PO Box 478
Coppell TX 75019
Project: Creekview Drive and
Freeport Parkway
Coppell, TX
Services: Cylinder Collection
Report No.: 148461
Project No.: 015729
Date of Service: 04/25/2002
Report Date: 05/06/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time:
Page 1 of 1
7:00am - 9:00am
Technician: Cody Carroll
Report Distribution:
(1) City of Coppell (1) City of Coppell
(1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. C
(1) City of Coppell Pro
(1) Infrastructure Services, Inc.
ty Stark
ect Manager
LIMITATIONS: The tnst results presented herein were prepured bused upon the specific sampl~ ~vid~ for t~ We assumeno responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of shnilar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
99DK Page 1 of I
ineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630=9745
(214) 630=9819 (fax)
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
City ofCoppeU
Atm:Ms. SusanTaylor-Engineering Dept
PO Box 478
CoppellTX75019
Report No.: 148627
Project No.: 015729
Date of Service: 04/26/2002
Report Date: 05/06/2002
Creek-view Drive and
Freeport Parkway
Coppell, TX
Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
T~ST METHOD:
CONTRACTOR: Infrastructure Services, Inc.
CONCRETE SUPPLIER: TX~
PLANT: 41
SPECIFICATION REQUIREM~.NTS
3000 psi ~ 28 Days
3% - 5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
M~X DESIGN I.O.: 8274
PLACEMENT DATE:
WEATHER CONDITIONS:
TIME SAMPLED: 9:40am
TEMPERATURE (F) - AIR
TRUCK NO: 462
Am CONTENT (./.): 4.5
04/26/2002
Cloudy
BATCH TIM~: 8:01am
70 ~ CONCRETE: 80 ~r
TICI~mT NO: 3119797
UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Red ~am? enll'ance to Wagon Wheel Park at Creekview Drive
SAMPLE LOCATION:
REPORT OF TESTS
10' east x 5' north of southwest
comer of red stamped entrance
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 3.5 04/29/2002 3 124155 4390 Unbonded Cap
1 2 3.5 05/03/2002 7 143410 5070 Unbonded Cap
I 3 3.5 05/24/2002 28 Unbonded Cap
1 4 3.5 05/24/2002 28 Unbonded Cap
1 5 Hold
LIMITATIONS: The test results presented he.in were prepared based upon the specific samples provided for testing. We assume no ~ponsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
01DK Page I of 2
Report No.: 148627
Project No.: 015729
Client: City of Coppell
Water added at site: 5
Technician: Eric White
Report Distribution:
(1) City of Coppell
(l) City of Copp~ll
(1) City of Coppell
(I) Infrastmcturo Services, Inc.
gallons
Started: 8:30am
(1) City of Coppell
(1) Schrickel, Rollins & Assoc., Inc.
Finished: 10:30am
RoneEilavS k~-'
Project Manager
LIMITATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. Wc assumc no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for thc exclusive use of the clients to whom they arc addressed and shall not be r~roduced except in full without the written approval of Ron¢ Engineers, Inc.
01DK Page 2 of 2