ST0001-LR020515 (2)RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF CYLINDER COLLECTION
Client:
Infrastructure Services, Inc.
Attn: Mr. Phillip Bennett
PO Box 496448
Garland TX 75049-6448
Project: Creekview Drive and
Freeport Parkway
Coppell, TX
Services: Cylinder Collection
Report No.: 148138
Project No.: 026186
Date of Service: 04/20/2002
Report Date: 05/15/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prier to this date.
Technician Time: 7:00 a.m. - 9:00 a.m.
Page 1 of 1
***REVISED this date to reflect correct client***
Technician: Anthony Maldonado
Report Distribution:
(1) Infrastructure Services, Inc.
(l) City of Coppcll
(1) City of Coppell
(1) City of Coppell
(1) Infrastructure Services, Inc.
(1) Schrickel, Rollins & Assoc., Inc.
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quaJity
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
99DF Page 1 of 1
RoneEngineers
8908 Ambassador Row
Dallas, Texas 75247-4510
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF CYLINDER COLLECTION
Client:
Infrastructure Services, Inc.
Attn: Mr. Phillip Bennett
PO Box 496448
Garland TX 75049-6448
Project: Creekview Drive and
Freeport Parkway
Coppe[[, TX
Services: Cylinder Collection
Report No.: 148698
Project No.: 026186
Date of Service: 04/27/2002
Report Date: 05/15/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time: 7:30am - 9:30am
Page 1 of 1
***REVISED this date to reflect correct clent***
Technician: Eric White
Report Distribution:
(1) Infrastructure Services, Inc.
(1) City of Coppell
(1) City of Coppell
(1) City of Coppell
(1) Infrastructure Services, Inc.
.(1) Schrickel, Rollins & Assoc., [nc.
Rone E~
C lay gtark
Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
99DK Page I of I
RoneEngineers
8908 Ambassador Row
Dallas, Texas 752474510
(214) 630-9745
(214) 630-9819 (fax)
REPORT OF CYLINDER COLLECTION
Client:
Infrastructure Services, Inc.
Attn: Mr. Phillip Bennett
PO Box 496448
Garland TX 75049-6448
Project: Creekview Drive and
Freeport Parkway
Coppell, TX
Services: Cylinder Collection
Report No.: 147306
Project No.: 026186
Date of Service: 04/06/2002
Report Date: 05/15/2002
Report of Collection
On this date, a Rone Engineers, Inc. representative arrived on site as scheduled
to pick up compressive strength test specimen cast prior to this date.
Technician Time:
Page 1 of 1
8:00 am to 10:00 am
***REVISED this date to reflect correct client***
Technician: Cody Carroll
Report Distribution:
(1) Infrastructure Services, Inc. (1} Infrastructure Services, Inc.
(1) City of Coppell (1) Schrickel, Rollins & Assoc., Inc. ·
(1) City of Coppell Pn
(1) City of Coppell
Stark
Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
{composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc.
99CM Page I of I