Loading...
ST0001-LR020515 (4) gineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148410 Project No.: 015729 Date of Service: 04/24/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3"-5" 3% - 6% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C- 1064 ASTM C- 138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/24/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 9:00am BATCH TIME: 8:26am TEMPERATURE (F)- AIR 75 F CONCRETE: 90 F TRUCK NO: 1125 TICKET NO: 7115787 AIR CONTENT (%): 4.0 UNIT WEIGHT (per): NA OVERALL PLACEMENT LOCATION: Paving - turn lane of Freeport Parkway to Ruby, eastbound approaches on State and southbound and northbound driveway leading into west parking lot, and apex of median of State & Freeport north & south SAMPLE LOCATION: 5' south x 3' east of northwest REPORT OF TESTS corner of approach at Freeport Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 3.0 04/27/2002 3 75455 2670 Unbonded Cap 1 2 3.0 05/01/2002 7 92375 3270 Unbonded Cap 1 3 3.0 05/22/2002 28 Unbonded Cap I 4 3.0 05/22/2002 28 Unbonded Cap 1 5 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 1 of 3 Report No.: 148410 RoneEngineers Project No.: 015729 m,~ns~ Client: City of Coppell Water added at site: 10 gallons *~*REVISED this date to reflect correct billing time. See report %149798 for overtime*** LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 011)K Page 2 of 3 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214} 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: City of Coppell Attn: Ms. Susan Taylor - Engineering Dept PO Box 478 Coppell TX 75019 Report No.: 148410 Project No.: 015729 Date of Service: 04/24/2002 Report Date: 05/15/2002 Creekview Drive and Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Infrastructure Services, Inc. CONCRETE SUPPLIER: Lattimore PLANT: 7 SPECIFICATION REQUIREMENTS 3000 psi ~ 28 Days 3" - 5" 3% - 6% ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-23 ! ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 42 PLACEMENT DATE: 04/24/2002 WEATHER CONDITIONS: Cloudy TIME SAMPLED: l:05pm BATCHTIME: 12:36pm TEMPERATURE (F)-AIR 78 F CONCRETE: 90 F TRUCKNO: 975 TICK~TNO: 3143682 AIR CONTENT (%): 4.5 UNIT WEIGHT (pcB: NA OVERALL PLACEMENT LOCATION: Paving - turn lane of Freeport Parkway to Ruby eastbound approachments on State and southbound and northbound driveway leading into west parking lot and noses ofmediun State & Freeport north & south SAMPLE LOCATION: I0' north x 8' east of southwest REPORT OF TESTS corner of driveway west parking lot Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MARKED SLUMP SET NO. (inches) DATE TESTED MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) (lbs. force) (psi) TYPE 2 1 3.25 04/27/2002 3 80130 2830 Unbonded Cap 2 2 3.25 05/01/2002 7 89780 3170 Unbonded Cap 2 3 3.25 2 4 3.25 05/22/2002 05/22/2002 28 Unbonded Cap 28 Unbonded Cap 2 5 Technician: Anthony Maldonado Report Distribution: (1) City of Coppell (1) City of Coppell (1) City of Coppell (1) Infrastructure Services, Inc. Hold Started: 7:30am Finished: 3:30pm (1) City of Coppell (1) Schrickcl, Rollins & Assoc., Inc. Ron Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided l~r testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other li:ature &similar subject matter provided by persons or conditions over which we have no control. Our lettem and repons are for the exclusive use of the clients to whom they am addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. 01DK Page 3 of 3