Townhouses-CS010714P.O. BOX 478
255 PARKWAY BLVD.
COPPELL, TX 75019
FAX NO. (972) 304-3570
ENGINEERING DEPARTMENT
·
FAX NO.:
TRANSMITTED BY:
TIME:
NUMBER OF PAGES (INCLUDING COVERSHEET):
IF YOU DO NOT RECEIVE ALL OF THE PAGES, PLEASE CALL (972) 304-3679.
Engineering - Excellence By Design
21~8121321
12-JUL-01 11~25 FROM:TU MECHANICAL ENG
Oi:TXU
M//ton Vr/a, P.E:
D~l/a~ Texas 75201-3,171
Phone: 21'4 8'/2-83'24
FAX: 2~4 8'12-f3Zl
ID=2148121321
PAGE
1/6
To; Garreth Ca~._~ll- City of Coppeil From= Milton VHa / Engineering Support
~ 972.__?0~..3-_'~'0 P.a~e~: 6includir~coversheet
~ 972.304.3685 Date~ 09/I2/01
R~ Townhotlse$ of Coppell (Job ti20.055) CCc Robert Thompson- North La~e SES
Baty Houston- TXU Business Servfce$
ITl U~ent E] For Re~'w 0 iqease Comme~ ~ Iqe~se Reply r'l For Yoor Reconis
· Comments:
Mr. Campbell:
Per our phone ¢o,,~,~on this morning, I am tran.~nit~r~ documents submitted to TXU by
perfo, ned at the crc~__~_in9 of the TXU 42" ~.r~-.'ne ~ your mump~e oox culvert ~m; -' .
Prior to your a~,~o,~a;;on of this wor~, we would a~-~-~.-:~'te-, your a~u;v,~'~-,~ our fol;o~i~..:;
corlcerns:
The cu,,~,~; ~.Taest by Rick VanGuilder is a variance from fJ~e approved design issued by
Mi~'~a~; ~.~-.~:. ~'-
· '~ · '. ' ·
9~_neer must be notified of
2. Since the TXU p~'F~i-,e is currently supported by the concrete cradle, removal of the
~occ-~ure ~-_-~_-- m be ~:,,-_,~d m the project ~
is damaged during removal or replacemenL
n_~__s to include qualib/ corrlrol requiren~e,;a for pipe
3. The revf=~.~
suppor6 including pipe beddir~ ma~rl~, soil ~y requ~,=, .... ~ etc.
12-JUL-0! 11;~S F~OH~TU ~£CHANICAL £NG ID:2140121321 P~GE 2/6
July 12, 2001
tt is our understanding tha~ replacement of I~e pipe will be condu~t~l under the
su~t~rvision of Chuci; Eubank, Hanson Pipe and Prod~. Pipe de~ils provfded to Rick
VanGuilder by Hanson I:qpe are included wi~ b~s transmittal for your approval.
consfruc~on and demobilized prior to_pressure teeb'n~ TXU will request the conOacto~
work be covered under v~ and provide for maintenance repairs to the secfJon of
disturbed pipeline for a pe~od of ~ year~ I will provide mom detail on this issue in a
If you have any quesf, fons feel free to call.
Milton Vrla, P.E.
Rick VanGuilder Memo to Rober~ Thompson dated 07/09/01
Copy of Box Culwrt- Plan V'~v
Copy of Box Culvert- Profile V-~w
Henson Pipe and Product Submittal
® Page2