Loading...
Townhouses-CS010809GENT BY: ANDANTE DEVELOPMENT; 9724146613; AUG-9-01 2:21PM; PAGE 1/2 Fax To: Garreth Of: City of Coppell Fax: 972. 304. 7041 Pages: 1, including this cover sho~'t. Date: August 9, 2001 ,a~ per our d~scussion, plcase find enclosed thc specs :t~r fin/sh ofOffsite TXU pipe.. I am anticipating TXU to approve thc cnclo.~d spec. ~teve · ~ENT BY: ANDAh~TE DE~/ELOPMENT; 9724146813; AUG-g-01 2:2tPU; PAGE 2/2 HUg ~9 01 Ol:20p Hat, hart D Hater' C.E. b~LECT OR GEANULAR MAIFJaAL COI~ACl[O PROCTOR Ol~lca'rY j.~.__. O.D. + 2 FT. INI11/L RLL EI. EVA~OR COMPACTED CRU~'IEO SlO. ~RN)AI10N NATI~ BAC:XRLL, (SEE NOTES) GROUND AS EXCAVAIED FOR BOX CULVERT COdSlRUCllON RCCP EMBEDMENT DERAIL NTS NOTES: · TXU Energy will be provided a written inspection report fram H~laOn Pipe and Products which details damage to existing pipe sections and provides detded repair procedure for each damaged section identified, The report shell identify location of re~elred areas for TXU maintenance records. · Pipeline route ~dl be filled with native materiel to a depth or at least one toot above the proposed top of the TXU pipe. Tho f'al will be mode in lifts and compacted to o mln~um of $5~ Std. proctor density at a moisture content acceptable to the soils lob. The lob will take 2 density tests per lift. The lab will provide cop;es of their test results to TXU, · After the first fill operation ia complete, o bench will be mt into the ffi sectim to six inches below the proposed botto~ of the pipe, Embedment shall be es shown o~ the detail. · Above the elevation of one foot above the top of the pipe, native materiel ~hell be replaced end compacted to 95~ Std. proctor density using the procedure noted obeys. The fill wi]l be returned to the orynal elev~Uon or three feet above the pipe, whichever is higher. DETAIL FOR REINSTALLA TION OF TXU 42" RCCP J CROSSING 3-~'x4' 80X CULVERT J · TOWNHOUSE$ OF COPPELL .m[. ~/'m/~ I M2u./o~ ?_~o..$ I ~ Odla& 7,xe, 7~2~! / Ph, (2~4) 739-4~41 /