Townhouses-PL010816 992 504 554?
CITY OF COPPELL 9 CITY OF COPPELL N0.242 ~01
08×16×01
14~57
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
4.
$.
6.
7.
8,
9.
10.
11.
12.
13.
Garreth Campbdl, Construction !~ctor Engineering
Marshall Crow, Utllitim Division Public Works
August 16, 2001
Walk-thru Townhm~ses of Coppell
Southw ~' ~ sewer needs top ring _cemented ~nd i~tall chlnmey seal and rain
All City cleanouts need sweep "T" and a ~ pipe to the
$~i~n~y sewer manhole in middle of block has concrete in bottom.
Find and uncover existing manhole on southeast corner of property.
Lot 41 replace meter can.
Lot 33 water valve needs extension,
Lot 26 rpmove false bottom in ~nltary S~Wer.
Lot 13 valve stack on main is crooked.
LOt '~ l~htell bottom Fing on ehimney seal,
Lot 2 straighten fire hydrant.
Sanitary sewer noFthea~ corner needs chimney ~ s~d rain pan,
l~t 44 fwe hydrant will not shut off.
~ 38 f*~e bydrnnt valve needs extemJon,
~ OF COPP~tt p~l_~!fJC IFORg$ DF~PARTME. Arf