Loading...
Townhouses-CS01102310,'23/01 TUE 10:26 FAX 9724041833 LIBERTY ~001 DATE: October 23, 2o01 TO: Mr Garreth D Campbell Construction Inspector FROM: Keith Reinhart Punch Item #24, Townhornes of C oppell Sir, I am following up to make sure Lee Stone with City Inspections has contacted you regarding "unpaid fees" on the project. The four items showing to be owed (Wastewater Tap Inspection, Water Meter (Domestic), Meter Deposit (Domestic), and Utility Final Inspection) are paid at issuance of each individual unit building permit, thus not due at this time for release of the subdivision. Please let me know by phone or fax that this has been resolved and I can strike it l¥om the list I thank you in advance Phone 214.632.0417 Fax 972,4041833 Regards, Keith Reinhart Subsidiary of Liberty Residential" 4101 MeEwen, Suite 110 o Dallas, Texas 75244 o Phone (972) 755-1085 · Fax (972) 404-1833 10z23/01 TUE 10:26 FAX 9724041833 LIBERTY DEVELOPMENT FEES oPROIECT NAME: ENGINEER: GINATION DATE: Townhouses of Coppell 10/12/00 - SENT 10112/00 lotiz/oo lO/12/oo 8/27/01 8/27/01 2%4% lo/12/0o ASSESSMENT Park Fee Water Impact Fee Wastewater Tmpect Fee Street Sign street Light Construction Inspection Roadway Impact-Zone OO2 A~ESSED FEE AMOUNT PAZD DATE $118,220.OO $118,220.00 10/16/00 $50,175.00 $S0,175.00 10/16/00 $41,850.OO 341,850.00 10/16/00 $603.34 $603.34 9/21/01 $2,640.60 $2,640.60 9/21/01 $35,364.00 $35,364.00 10/23/00 355,476.00 $55,476.OO 10/16/00 2/8/01 3/19/01 5/7/ol s/14/ol 5/21/ol 6/4/01 7/9/0~. Street Cut Permit Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Overtime Inspection Water Tap Inspection -- Wast~water Tap [nspecUon Water Neter (DomesUc) ~, Water Meter (Flre/Irdg) Meter Deposit (Domestic)-- Meter Deposit (Fire/Irrig) Utility Final Inspection ~ TOTALS $240.00 $240.00 $12o.oo $160.00 $24o.oo $2oo.oo $Z60.00 $4,8OO.00 $4~6S0.00 .. ,:$2,47L01' $2,536.12 $3,2S5.OO $90,00 $4,650.00 Total Fees 3328,141.07 $240.00 2/23/0L $z4o.oo 4/3/Ol 3120.00 8/14/01 $160.OO 8/14/01 $24O.00 6/5/m $200.00 6/13/03. 3160.00 7/31/01 350.00 4/6/01 $2,157.38 4/6/01 $30.00 4/6/01 Fees Paid Amount Owed $307,926.32 $20,214.75 Prior To Construction Erosion Control Approved E.P.A.-N.O.I, Recd. Const. Plan Approved Date Received prior To Final Acceptance As Built P~an Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.