Loading...
Townhouses-LR000708ALPHA TESTIN( , INC. 2209 Wisconsin St., Suite I00 Dallas, Texas 76229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 07/08/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-12B TEST DATA: TEST ~ ELEV. SOIL ID OP~MUM MAYJMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,,% NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 114 07~08~00 FG-9.7 4 20.1 101.9 20.8 103 101 1-A 115 07/08/00 FG-10.2 4 20.1 101.9 20.6 102 100 1-A 116 07/08/00 FG-9.7 4 20.1 101.9 20.7 101 99 1-A 117 07~08~00 FG-12.3 4 20.1 101.9 20.6 102 100 1 -A 118 07/08/00 FG-10.7 4 20.1 101.9 21.5 103 101 1-A 119 07~08/00 FG-11.6 4 20.1 101.9 20.6 101 99 1-A 120 07/08/00 FG-9.5 4 20.1 101.9 20.7 101 99 1-A TEST LOCATION: 114 3LOCK A, PAD #57 115 BLOCK A, PAD #58 116 BLOCKA, PAD#59 117 BLOCKA, PADffi~I 118 BLOCK A, PAD ~2 119 BLOCK A, PAD 120 BLOCKA, PADffi~4 CC: STEVE TOPLETZ, ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WiTH SPECIFICATIONS ~ 2 NATURAL SUBGRADE B, PERCENT COI~°ACT1ON DOES NOT COMPLY WiTH SPECIFICATIONS ~~ 4. CEMENT13~EA~D D. RETEST Geotechnical Engineering · Const~ction Mat, fi~l$ T®sting · Environmental Engineering · Con~ul~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 07/08/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-12A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ NUMBER MOISTURE DRY DENSrrY MOISTURE DRY DENStTY COMPACTION COMMENT* 107 07/08/00 FG-10.3 3 21.6 98.8 22.6 98 99 1-A 108 07/08~00 FG-10.1 3 21.6 98.8 23.6 98 99 1-A 109 07/08/00 FG-9.7 3 21.6 98.8 24.0 96 98 1-A 110 07~08~00 FG-9.8 3 21.6 98.8 24.6 96 97 1 -A 111 07~08~00 FG-9.2 3 21.6 98.8 23.4 97 98 1-A 112 07/08/00 FG-9.2 3 21.6 98.8 23.6 97 98 1-A 113 07/08/00 FG-9.2 4 20.1 101.9 20.8 100 98 1-A TEST LOCATION: 107 BLOCKA, PAD#61 108 BLOCKA, PAD~63 109 BLOCK A, PAD #62 110 BLOCK A, PAD #56 111 BLOCK A, PAD #57 112 BLOCKA, PAD#58 113 BLOCKA, PAD#59 CC: STEVE TOPLETZ, ANDANTE * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY W~TH SPECIFICATIONS I FILL 2. NA~JRAL SUB~RAD~ B, PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT31,~EATED D. RETEST Geotechnical Enginee#ng · Construction Materials Testing · Environmental Engineering ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Da#os, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 07/08/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES OUR REPORT NO. 00430-12 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH-"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSlIY COMP^CTION COMMENT* 1 O0 07/08/00 FG-11.1 3 21.6 98.8 22.9 99 1 O0 1-A 101 07/08/00 FG-10.6 3 21.6 98.8 21.5 99 101 1-A 102 07/08/00 FG-10.2 4 20.1 101.9 21.9 101 100 . 1-A 103 07/08/00 FG~I 1.8 4 20.1 101.9 21.3 102 100 1-A 104 07/08/00 FG-11.3 4 20.1 101.9 20.2 102 100 1 -A 105 07~08~00 FG-9.7 4 20.1 101.9 20.5 101 99 1-A 106 07/08/00 FG-10.8 3 21.6 98.8 23.8 99 100 1-A TEST LOCATION: 100 BLOCK A, PAD #63 101 BLOCKA, PAD#62 102 BLOCKA, PAD~2 103 BLOCKA, PAD#61 104 BLOCKA, PAD#61 105 BLOCK A, PAD #58 106 BLOCKA, PAD~61 CC: STEVE TOPLETZ, ANDANTE 1. FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY Wn'H SPECIFICATIONS 2. NATURAL SUBORADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS · 3, UME STABIMZED ' C, PERCENT IN PLACE MOISTURE DOES NOT COMPLY WIIH SPEC~FICA33ONS 4. CEMENTTREATED D. RETEST Geotechnical Engineering II Construction Materials Testing · Environmental Engineering ALPHA TESTING, INC. 2209 Wisconsin St., Sulte 100 Dallas. Texas 70229 972/620-8911 - 972/263-4937 (Metro) FAX: ~72/406-8023 TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07/08/00 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-1 OB TEST DATA: TEST ~ ELEV. SOIL ID OI=TIMUM MAXIMUM LAS IN PLACE IN PLACE PERCENT NO. DATEDEPTH~,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSFrY COMPACTION COMMENT* 72 07/08/00 SG 5 12.5 108 16.1 106 98 2-A 73 07/08/00 SG 5 12.5 108 15.7 108 100 2-A 74 07/08/00 SG 5 12.5 108 15.8 110 102 2-A 75 07/08/00 SG 5 12.5 108 13.8 109 101 2-A 76 07/08/00 SG 5 12.5 108 13.9 110 101 2-A 77 07/08/00 SG 5 12.5 108 16.3 108 100 2-A 78 07~08/00 SG 5 12.5 108 14.0 109 101 2-A TEST LOCATION: 72 BLOCK B, PAD #30 73 BLOCK B, PAD f/~29 74 BLOCK B, PAD ~28 75 CLUB HOUSE AREA 76 BLOCKB, PAD~ 77 BLOCK B, PAD ft-3 78 BLOCK B, PAD ~.4 CC: STEVE TOPLETZ, ANDANTE 1. FILL ~' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPAC~ON DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4 CEMENTmEATED D. RETEST Geotechnical Engineering · Construction Matedals Testing · Environmental Engineering · ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Da#os, Texas 76229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 07/08/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-10A TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~.~ NUMBER MOISTURE DRY D~NSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 65 07/08/00 FG-11.2 4 20.1 101.9 22.6 100 98 1-A 66 07~08~00 FG-10.7 4 20.1 101.9 22.1 101 99 1-A 67 07/08/00 FG-10.7 4 20.1 101.9 23.6 101 99 1-A 68 07/08/00 FG-10.2 4 20.1 101.9 22.6 100 98 1-A 69 07/08/00 FG-13.3 I 22.5 99.5 24.3 100 101 1-A 70 07/08/00 FG-12.8 I 22.5 99.5 24.3 99 99 1 -A 71 07/08/00 FG-11.2 1 22.5 99.5 23.8 99 100 1-A TEST LOCATION: 65 BLOCK A, PAD #58 66 BLOCK A, PAD #58 67 BLOCKA, PAD'J9 68 B~OCKA, PAD#59 69 BLOCKA, PAD~61 70 BLOCKA, PAD#61 71 BLOCK A, PAD #62 CC: STEVE TOPLETZ, ANDANTE 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~~ 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENTTREATED D, RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Const~ltin~ // ALPHA TESTING, INC. 2209 Wisconsin St,, Suite ?00 Dallas, Texas 75229 972/620-8911 - 972/263-4937 ('Metro) FAX: 972/406..8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR LEMP DEVELOPMENT DATE 07/08/00 DALLAS, TEXAS PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-10 TEST DATA: TEST ~ ELEV, SOIL ID OPTIMUM MAXIMUM LAE IN PLACE IN PLACE PERCENT NO, DATEDEPTH-'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 58 07/08/00 SG 5 12.5 108 14.1 107 99 2-A 59 07~08~00 SG 5 12.5 108 13.7 105 97 2-A 60 07~08/00 FG-8.0 2 19.0 100.4 21.6 100 99 1-A 61 07/08/00 FG-8.0 2 19.0 100.4 21.5 99 99 1-A 62 07/08/00 FG-7.4 4 20.1 101.9 20.1 100 98 1-A 63 07/08/00 FG-7.4 4 20.1 101.9 20.2 98 96 1-A 64 07/08/00 FG-6.8 4 20.1 101.9 20.3 100 99 1-A TEST LOCATION: PAVING 58 INDEPENDENCE DRIVE - 30' NORTH AND 30' EAST OF NORTHWEST CORNER OF BUILDING PAD #65 59 INDEPENDENCE DRIVE - 35' NORTH AND 35' WEST OF NORTHWEST CORNER OF BUILDING PAD #56 60 INDEPENDENCE DRIVE - 40' NORTH AND 50' EAST OF NORTHWEST CORNER OF BUILDING PAD #65 61 INDEPENDENCE DRIVE - 30' NORTH AND 35' EAST OF NORTHWEST CORNER OF BUILDING PAD ~56 62 INDEPENDENCE DRIVE - 35' NORTH AND 35' EAST OF NORTHWEST CORNER OF BUILDING PAD ~65 63 INDEPENDENCE DRIVE - 30' NORTH AND 50' EAST OF NORTHWEST CORNER OF BUILDING PAD t~56 64 INDEPENDENCE DRIVE - 35' NORTH AND 50' EAST OF NORTHWEST CORNER OF BUILDING PAD #65 CC: STEVE TOPLETZ, ANDANTE I FILL * A. ~N PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Z 2 NATURAL SU~RADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~ p 3, LIME STABILIZED ' C. PERCENT IN PLACE MOiSTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENTTREATED D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Con ~i'~