Loading...
PA9702-LR 991007GROUT COMPRESSIC STRENGTH TEST 8901 Carpenter Frwy., Suite #10~ Dallas, Texas 75247 DateofService: 09/07/1999 Report No.: 9924214 Report Date 10/07/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~FReid 300BlockofParkwayBlvd 732 DeForest Coppell, Texas/Prj. #96051 Coppell TX 75019 Services: Sample grout from delivery vehicle, cast 3" x 3" x 6" prisms in accordance with the recommendations of ASTM C 1019. PROJECT DATA CONTRACTOR: Hisaw & Assoc. GROUT CLASS: Grout GROUT SUPPLIER: TXI pLACEMENTDATE: 09/07/1999 BATCHIlh4E: 8:30am PLANT: On-site Tnvn~ SAMPLED: 9:00alTl BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDrrXONS: Partly cloudy STRENGTH: 2500psi @ 28 Days TEMPERATURE (F) - AIR 83 F GROUT: 82 F TRUCK NO: N/A TICKET NO: N/A TEST METHOD: ASTMC1019 PLACEMENTLOCATION: Same as sample location SAMPLE LOCATION: See below for sample location SAMPLE SIZE: 3"x3"x6" REPORT OF TESTS PRISM MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. force) (psi) 1 1 9.50 09/14/1999 7 50220 3810 1 2 9.50 10/05/1999 28 61750 4810 1 3 9.50 10/05/1999 28 59790 4310 Average 4560 Sample Location: Line F ~ south wall at 22 feet, line B.1 gym north wall at 22 feet. Technician: Mike Odom Started: 7:30am Finished: 9:30am I'~ Engineering, Inc. Report Distribution: ~_/5 ~ (1) City of Coppel| (1) City of Coppcll - Engineering (1) BrinkIcy Sargent Architects (l) City ofCoppell - Bldg. Insp. Eugene Harbour (1) Turner Engineers (I) City ofCoppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 09TMP Page I of 1