Loading...
Townhouses-LR000728ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dollos, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-81323 TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07/28/00 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-45B TEST DATA: TEST · SOIL ID OF~IMUM MAXIMUM LAB IH PLACE IN PLACE P~RCENT NO. DATE NUMBER MOl~rtJRE DRY DENS~rY MOISTURE DRY DENSnY COMPAC~ON COMMENT* % PC~ % I:~CF 762 07/28/00 FG-4.9 4 20.0 101.9 20.3 103 101 1-A 763 07/28/00 FG-4.8 4 20.0 101.9 20.5 102 100 1-A 764 07/28/00 FG-5,1 4 20,0 101.9 21.6 101 99 1-A 765 07/28/00 FG-5.0 4 20.0 101.9 22,2 101 99 1-A 766 07/28/00 FG-5.1 4 20.0 101.9 22.0 102 100 I-A 767 07/28/00 FG-4.8 4 20.0 101.9 22.6 100 98 1-A '768 07/28/00 FG-5.0 4 20.0 101.9 20.2 103 101 1-A I I.-~ I LUI..,~ I IUIN; 762 BLOCK B, PAD #33 763 BLOCK B, PAD #34 764 =~LOCK B, PAD #35 765 BLOCK B, PAD #36 766 BLOCK B, PAD #37 767 BLOCK B, PAD #38 768 BLOCK B, PAD #39 CC: STEVE TOPLETZ, ANDANTE 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREA3~D * A. IN PLACE PERCENT MOIS3URE AND PERCENT COMPACTION COMPLY WITH SPECIF~CA31ON$ B. PERCENT COMPACTION DOES NOT COMfl!.Y Wl~{ SPECIFICATIONS ALPH/~ T,,~BTING, i1~3. - Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 70229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07~8~0 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-45A TEST DATA: TEST ___'~_.. ELEV. SOIL ID O~nMUM MAXIMUM LAB IN PLACE IN PLACE P~RCENT NO. DATE NUMBER MO~'"ruRE DRY D~NSITY MOISTURE DRY DENSITY COMPAC~ON COMMENT* % P(::F % PCF 755 07/28/00 FG-4.0 4 20.0 101.9 20.6 102 100 1-A 756 07/28/00 FG-4.1 4 20.0 101.9 20.8 101 99 1 -A 757 07/28100 FG-4.0 4 20.0 101.9 23.4 99 97 1-A 758 07/28/00 FG-4.5 4 20.0 101.9 21.8 101 99 1-A 759 07/28/00 FG-3.7 4 20.0 101.9 20.6 103 101 1.-A 760 07/28100 FG-4.9 4 20.0 101.9 21.0 102 100 1-A 761 07/28/00 FG-4.4 4 20.0 101.9 23.5 98 96 1-A 755 BLOCK B, PAD #26 756 BLOCK B, PAD f~27 757 BLOCK B, PAD #~28 758 BLOCK B, PAD #29 759 BLOCK B, PAD ~30 760 BLOCK B, PAD#31 761 BLOCK B, PAD #32 CC: STEVE TOPLETZ, ANDANTE Geotechnical Engineedng · Construction Materials Testing · Environmental Engineering · Consulting ALPHA TESTING, INC. 2209 WisconSin St., Suite I00 Oollas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07/28100 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-45 )ATA: TEST ___~7~_.. ELEV. SOIL ID O~TIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE[3P_I-'I~ NUMBER MOISTUR:E DRY DENsn'Y MO~,STURE DRy DF..NStr, r co~p~ COMMENT* % PCF % PCF 748 07/28/00 FG-2.6 I 22.5 99.5 22.8 98 99 1-A 749 07/28/00 FG-3.2 I 22.5 99.5 25.1 95 95 1-A 750 07/28/00 FG-3.3 1 22.5 99.5 23.9 97 97 1-A 751 07/28/00 FG-3.4 I 22.5 99.5 23.3 98 98 1-A 752 07/28100 FG-3.7 I 22.5 99.5 23.6 97 98 1-A 753 07/28/00 FG-3.8 1 22.5 99.5 22.9 97 98 1-A 754 07/28/00 FG-4.3 1 22.5 99.5 23.7 97 97 1 -A TEST LrJL;A I IMm: 748 BLOCK B, PAD #10 749 3LOCK B, PAD #11 750 BLOCK B, PAD #12 751 BLOCK B, PAD #13 752 BLOCKB, PAD#14 753 BLOCK B, PAD #15 754 BLOCKB, PAD#16 CC: STEVE TOPLETZ, ANDANTE 1. FILL * A. IH PLACE PERCENT MOISllJRE AND PERCENT COMPACTION COMPLY WITH ~ECIFICATIONS Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting ALPI~affTESTING, INC. ALPHA TESTING, INC. 2209 Wisconsin St., Suite Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07/28/O0 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-44B TEST DATA: TEST _ _ _~'~._.. ELEV. SOIL ID Om3MUM I~XJMUM I. AB IN I~.ACE IN PLACE PERCENT NO. DATE NUMBER MO~SI~J~E DRY D~NSITY MOIS3~IRE DRY CENS~Y COMP~nON COMMENT* 741 07/28/00 FG-1.8 2 19.0 100.4 20.5 99 98 1-A 742 07/28/00 FG-2.1 2 19.0 100.4 19.5 100 99 1-A 743 07/28/00 FG-2.6 2 1~.0 100.4 19.3 99 98 1-A 744 07/28/00 FG-2.7 2 19.0 100.4 19.3 98 97 1-A 745 07/28/00 FG-4.5 2 19.0 100.4 21.2 99 98 1-A 746 07/28/00 FG-4.3 2 19.0 100.4 22.7 98 98 1-A 747 07/28100 FG-4.6 2 19.0 100.4 21.0 100 100 1-A 741 BLOCKA, PAD#18 742 BLOCK A, PAD #19 743 BLOCK A, PAD ~20 744 BLOCK A, PAD #21 745 BLOCK B, PAD#39 746 BLOCK B, PAD #38 747 =ILOCK B, PAD #37 CC: STEVE TOPLETZ, ANDANTE 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting ALPHA TESTING, INC. 220~ Wisconsin 5~., Su#e 100 Do#os, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07/28~0 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-44A TEST DATA: TEST ___~._.. ELEV. SOIL ID Om'~MUU MAXIMUM LAB IN pLACE IN Pt. ACE PERCENT NO. DATE NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* 734 07/28/00 FG-2.5 2 19.0 100.4 20.9 101 101 1-A 735 07/28/00 FG-2.5 2 19.0 100.4 20.0 . 99 99 1-A, 736 07/28/00 FG-2.5 2 19.0 100.4 20.5 99 99 1-A 737 07/28/00 FG-2.6 2 19.0 100.4 20.1 98 97 1-A 738 07/28/00 FG-2.7 2 19.0 100.4 21.4 99 98 1-A 739 07/28/00 FG-1.8 2 19.0 100.4 21.9 100 100 1-A 740 07/28/00 FG-1.8 2 19.0 100.4 21.6 101 100 1-A I r'~ I LUU/'t I I",.~1~1, 734 BLOCK A, PAD #10 735 BLOCK A, PAD #11 736 BLOCKA, PAD#12 737 BLOCK A, PAD #13 738 BLOCKA, PAD#14 739 BLOCKA, PAD#16 740 BLOCK A, PAD #17 CC: STEVE TOPLETZ, ANDANTE 1. FILL 2. NATURAL SUBGRADE 3. LIME STAB~L.JZED 4. CEMENT TREATED a A. IN PLACE PERCENT MOISPJRE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ALPHA TESTING, IN~.~ Geotechnical Engineering · Construction Materials Tasting · Environmental Engineering · Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Do#os, Texos 75229 972/620-8911 - 972/26,3-4937 (Metro) FAX; 972/406-8023 TESTED FOR LEMP DEVELOPMENT DALLAS, TEXAS REPORT OF FIELD COMPACTION TESTS DATE 07/28/00 PROJECT COPPELL TOWNHOMES COPPELL, TEXAS OUR REPORT NO. 00430-44 ST DATA: TEST ___~_.. ELEV. SOIL ID O~nMUM MAXIMUM LAB IN PLACE IN PLACE P~RCF. N~ NO. DATEU~Fim~ NUMBER MOISTURE DRY DENSrTY MOtS~URE DRy [XENS~TY COMPACTION COMMENT* % PCF 96 PCF 727 07/28/00 FG-3.9 2 19.0 100.4 20.9 100 100 1-A 728 07/28/00 FG-3.1 2 19.0 100.4 20.1 99 99 1-A 729 07/28/00 FG-3.6 2 19.0 100.4 22.0 100 99 1-A 730 07/28/00 FG-2.6 2 19.0 100.4 22.4 99 98 1-A 731 07/28/00 FG-3.3 2 19.0 100.4 21.9 97 96 1-A 732 07/28/00 FG-2.9 2 19.0 100.4 19,5 98 98 1-A 733 07/28/00 FG-2.6 2 19.0 100.4 20.7 100 99 1-A TP-$ I L~L;A I 727 BLOCK A, PAD 728 BLOCK A, PAD #3 729 BLOCK A, PAD ~4 730 'BLOCK A, PAD #5 731 BLOCK A, PAD ~6 732 BLOCK A, PAD #7 733 BLOCK A, PAD #9 CC: STEVE TOPLETZ, ANDANTE 1. FILL 2. NATURAL SUBGRADE' 3. LIME STABILIZED 4. CEMENT TREATED * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFIC^T1ONS B. PERCENT COMPACTION DOES NOT COMPLyWffH SPECIFICATIONS C, PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS [:). RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting